Saudi Aramco

Establish the current risk levels for equipment items and in-plant piping in order to reduce risk through inspection. ...

Featured Image

For SKE&C & Saudi Aramco

Establish the current risk levels for equipment items and in-plant piping in order to reduce risk through inspection. ...

Featured Image

For Abu Dhabi Polymers Company Limited (BOROUGE)

The Objective of Carbon black master batch (CBMB) is to produce the carbon black powder which is used for coating ...

Featured Image

For ADNOC Refining

The objective of the CONTRACT was to verify that HSE Critical Equipment and Systems (HSECES) had been ...

Featured Image

For Dolphin Energy Limited

The objective involved was to provide the services of capable, experienced, qualified personnel, requisite ...

Featured Image

For Dragon Oil

In order to manage the integrity of assets, Dragon Oil required a robust ASSEST INTEGRITY MANAGEMENT SOFTWARE tool to support...

Featured Image

For Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)

The objective was to develop complete Asset Integrity and HSE Program for KPOC facilities at EPC project stage, to aid them for smooth operation. ...

Featured Image

For OOCEP

To establish a comprehensive Integrity Management System (IMS) for OOCEP to ensure the integrity of assets in ABU TUBUL Block 60. ...

Featured Image

For Groupement Berkine

Strategize a Risk Based Inspection (RBI) Program and FMECA Study Analysis for Groupement Berkine HBNS and El-Merk field assets ...

Featured Image

For LUKOIL

The development, implementation and support of RBI programs for field production facilities and pipelines during ...

Featured Image

For ADNOC Refining

ADNOC Refining intended to carry-out Integrity and Remaining Life Assessment in ONE of the Boiler ...

Featured Image

For Hannover Consulting Engineers

There are eight (08) floors in the mixed use residential building, which is to be constructed at Sector RBW-7, ...

Featured Image

For TANAP

To provide Asset Integrity Management System (AIMS) for TANAP Gas Pipeline & Stations to manage the operational risk ...

Featured Image

For ZADCO

ZADCO facilities were designed and built in the early 1980's. During the past, many changes and improvements have been ...

Featured Image

For TS Tank

There are different thermal storage tanks, which are to be constructed at Dubai Creek Harbor development district cooling plant, Dubai ...

Featured Image

For Qatar Petroleum

Qatar Petroleum decided to carry out SIL Integrity Level For All Operating Units At QP Refinery MESAIEED, for intended ...

Featured Image

For SonaTrach

SonaTrach decided to carry out Study Of Classification Level Safety Integrity Of All SIL safety ...

Featured Image

For MARAFIQ

Marafiq decided to carry out Reliability Improvement Program for Power and Water Company in Yanbu, for intended safety and fit for purpose for the next 20 years. ...

Featured Image

For ADNOC Refining

General utilities plant (GUP) is the main power and water hub for Ruwais industrial sector as well as for Ruwais residential sector ...

Featured Image

For Qatar Petroleum

The objective of the CONTRACT is to provide a technical survey and HSEF QRA study for the Facilities. The technical survey ...

Featured Image

For ADNOC

BeAAT expansion is the up gradation of existing facility owing to increased future treatment / disposal requirement of ...

Featured Image

For SNGPL

BeAAT expansion is the up gradation of existing facility owing to increased future treatment / disposal requirement of ...

Featured Image

For PETRONAS

Establish Risk Based Inspection (RBI) Program for Topside Structure Including Turret, Hull Structure Including Cargo ...

Featured Image

For PETRONAS

To perform the Risk Based Inspection and Integrity Studies for 213 Pipelines belonging to the inventory of PETRONAS CARIGALI. ...

Featured Image

For Ma’aden Aluminum

Ma’aden Aluminum intended to conduct a thorough study of the available Civil and Structural elements in smelter area ...

Featured Image

For JGSK

To conduct the Risk-Based Inspection (RBI) Study for KNPC Clean Fuel Project MAA Package in order to assure asset integrity ...

Featured Image

For ADOC

ADOC has carried out HSEIA for its offshore facilities as per ADNOC CoP V1-02. The study has recommended some ...

Featured Image

For ADNOC LNG

ADGAS has implemented a comprehensive Integrity & Reliability Management System (AIRMS) and has additionally carried out additional studies to identify and monitor ...

Featured Image

For STAR RAFINERI

To outsource maintenance master data collection, creation, cleansing, enrichment and preparation of load ...

Featured Image

For Dolphin Energy Limited

Dolphin Energy Limited (DEL) hired Velosi to carry-out Reliability Centered Maintenance (RCM)/ Failure Mode ...

Featured Image

For Dragon Oil Turkmenistan Limited

The objective of the project is to develop an effective Enterprise Asset Management System (EAM) to automate ...