Our Experience

  • Project No: RSA/716/11-15 Design Review and calculation Approval of car shade (1 No.)
    Royal Arab Metal Works LLC
    Dubai, UAE
    2015
  • HAZOP Study of ESD & Blowdown Valves
    Pakistan Petroleum Limited (PPL)
    Pakistan
    2015
  • HAZOP Study and Hazardous Study
    L&T Oman LLC
    Oman
    2015
  • Provision of Third Party Design Approval for Conceptual design stage Documents of NG/SNG Installation in Buildings
    Ramboll Middle East
    Dubai, UAE
    2015
  • Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
    PETRONAS FLNG 1 (L) Ltd
    Malaysia
    2015
  • Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    TAKREER (ADNOC Refining)
    Abu Dhabi, UAE
    2015
  • Project No: VQ/40169 ITAS-SPA-Lifting calculation Review
    Qatar Petroleum
    Qatar
    2015
  • Project No: 5809100625 Detail Design of Monorail Beams
    Emirates Steel Industries
    Abu Dhabi, UAE
    2015
  • Structural Integrity Assessment & Life Extension Study for EB-37
    Bunduq Company Ltd
    United Arab Emirates UAE
    2015
  • Third party QSHE (Quality, Safety, Health & Environment) & House Keeping Audit at 09 PARCO & PARCO Stations and Terminal
    Pak-Arab Refinery Limited (PARCO)
    Pakistan
    2015
  • Third Party Services for Drops Survey of Onshore Rigs 2015 Call Out Basis KCA Deutag Drilling G.M.B.H Islamabad
    KCA Deutag Drilling G.M.B.H Islamabad
    Pakistan
    2015
  • SIL Study for All Operating Units at QP Refinery , Mesa
    Qatar Petroleum
    Qatar
    2015
  • Basic Engineering Study for Fire Risk Assessment Implementation (Phase-1)
    ADOC Abu Dhabi Oil Co. Ltd. (Japan)
    United Arab Emirates UAE
    2015
  • “Provision of Third Party Design Approval for Conceptual design stage Documents of NG/SNG Installation in Buildings. “
    HEBERGER ENGINEERING
    Abu Dhabi, UAE
    2015
  • Project No: 12423 Design Review and Approval of Lifting Frame & Lifting Beam (01. No)
    Velath Engineering International FZC
    United Arab Emirates UAE
    2015
  • Asset Register Verification & HSECES Implementation for GASCO Pipeline Network Division Phase-II
    GASCO Abu Dhabi Gas Industries Ltd
    United Arab Emirates UAE
    2014
  • PWA/GTC/004/11-12 – Consultancy Services For Survey Services For Pavement Condition And Right Of Way Asset Inventory Data Collection Including Provision Of Necessary Software Solutions, Training And Post Implementation Support Services EBSD /10-11/N/003/G
    ASHGHAL
    Qatar
    2014
  • KPOC CTR 001B Pipeline RBI Study-Gas
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Order Number: 3620072512 PO CTRs OFFSHORE VISIT – TE, D18,BY,BK as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014
  • Reliability Centered Maintenance (RCM) of Maintenance Optimization Program (MOP) as part of Continuous Improvement Plan (CIP) for Asset Integrity Management (AIM) System as FPSO Bunga Kertas
    MISC Offshore Floating Terminals (L) Limited
    Malaysia
    2014
  • Third Party Approval of detailed design package and of NG Installation Pipe work.
    Al Fanar
    Saudi Arabia
    2014