Our Experience

  • SIL Study for HTDC Project.
    Engro Polymer & Chemicals Limited
    Pakistan
    June 2021
  • SIL Validation Study for OVR
    Engro Polymer & Chemicals Limited
    Pakistan
    September 2021
  • HSE Studies for ESD System Upgrade At Zirku
    Actemium Emirates Projects
    United Arab Emirates UAE
    In Progress
  • SIL Verification Study for Ras Tanura Refinery Sour Water Stripper (SWS) Project
    Tecnicas Reunidas
    United Arab Emirates UAE
    In Progress
  • HAZOP & SIL Studies for Dalma Gas Development project Long Lead Items (GTG & GEC)
    Abu Dhabi National Oil Company (ADNOC) Upstream
    Abu Dhabi, UAE
    In Progress
  • Elaboration of a HAZOP study on about 300 P&IDs of the GTFT installations
    TFT Grouping
    IRAN
    In Progress
  • SIL Studies, workshop and reports as part of HSE Studies for EPC for Provision and Installation of New Bypass System at MP-21 and Removal of Redundant Lines at Old Mp-21 Station
    Galfar Engineering and Contracting/ ADNOC Onshore
    United Arab Emirates UAE
    In Progress
  • SIL STUDY AND VERIFICATION OF AMMONIA AND AN PLANT
    Fatima Fertilizer Company Limited
    Pakistan
    In Progress
  • HAZOP and Target SIL assessment
    BOROUGE
    Abu Dhabi, UAE
    In Progress
  • SIL level assessment is the second project, in which Akzo have already assigned SIL levels to limit switches and need to be verified as subject expert, as it’s the requirement of Akzo to verify from expert for it to be termed as approved.
    AKZO NOBEL PAKISTAN LIMITED
    Pakistan
    2020
  • SIL Assessment and Verification and HAZOP Workshops for LAM 22, Block 1, Block 2 & GOSP
    Dragon Oil Turkmenistan Limited
    Turkmenistan
    June 2020
  • SIL Assessment and Verification as part of Provision of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
    Bashayer Pipeline Company (BAPCO)
    Dubai, UAE
    In Progress
  • SIL (Safety Integrity Level) Study for Three Boilers and Boiler House.
    GlaxoSmithKline - GSK
    United Kingdom
    February 2017
  • SIL Study as part of CONTINUOUS RELIABILITY PROGRAM (PHASE 3) –YANBU Project
    Marafiq
    Saudi Arabia
    December 2019
  • Uniliver Pakistan ICF want to execute SIL assessment and verification for all of its Safety Instrumented Functions at Ammonia and LPG circuits in its Ice Cream Factory, Lahore. Cause & Effect Diagrams (C&EDs) are also to be developed by Consultant.
    UNILIVER PAKISTAN LIMITED
    Pakistan
    April 2018
  • The Study of Classification of Security Levels Integrities (SIL) All Instrumented Functions Safety Complex GL1Z, GL2Z, GL1K, GP2Z and GP1Z
    SONATRACH
    Algeria
    April 2019
  • SIL Re-verification Study
    Rabigh Refining & Petrochemical Co.
    Saudi Arabia
    September 2015
  • SIL Study for All Operating Units at QP Refinery , Mesaieed
    Qatar Petroleum
    Qatar
    March 2015
  • SIL & Integrity Verification for Single Wellhead Platforms EB-1, EB-4 & EB-8 Pipelines
    Bunduq Company Limited
    Abu Dhabi, UAE
    November 2014
  • Safety Integrity Level (SIL) Study for Single Wellhead Platforms EB-1, EB-4 & EB-8
    Bunduq Company Limited
    Abu Dhabi, UAE
    April 2014
  • 1
  • 2