Our Experience

  • Provision of Third Party Approval for Detailed Design Package of NG/ SNG Installation Pipe work for Five Star Hotel located at Plot No. C104B_02, Sector E16_02, Abu Dhabi, UAE
    Architectural Consulting Group, ACG
    Abu Dhabi, UAE
    2021
  • Provision of TPI Review and Approval of Hot Tapping on 8” Header with Branch Size 8” Sch 40.
    Cloud Energy Gas
    Dubai, UAE
    2021
  • Verification of Design of Temporary Supports for 36” Pipeline
    Granite Construction Company WLL
    Abu Dhabi, UAE
    2021
  • Provision of Third Party Approval for Detailed Design and Pre-Commissioning Package of NG/ SNG Installation Pipe work for Residential Building (P-330 & P-346), Al Raha Beach District, Abu Dhabi.
    Arabian Unigaz
    Abu Dhabi, UAE
    2020
  • Provision of Third Party Approval of Conceptual Package of LPG Installation work for The British School Al Khubairat, Plot No. 73, West 24_2 Abu Dhabi, UAE.
    DEWAN Architects + Engineer
    Abu Dhabi, UAE
    2020
  • Provision of Third Party Approval of detailed design package and Pre-Commissioning package of NG/ SNG Installation Pipe work.
    Altorath International Engineering Consultants LLC
    Abu Dhabi, UAE
    2020
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG Pipework Installation at Al Raha Beach Building – Plot RBW-06, Abu Dhabi
    Al Khail  Engineering
    Abu Dhabi, UAE
    2019
  • PROVISION OF THIRD PARTY REVIEW & VERIFICATION FOR CONCEPTUAL DESIGN STAGE OF NG AND SNG PIPEWORK INSTALLATION AT RESIDENTIAL BUILDING, SECTOR RBW-8, PLOT C-26, AL RAHA BEACH, ABU DHABI
    Hannover
    Abu Dhabi, UAE
    2019
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG / SNG Pipework Installation at Residential Building Plot C28, Sector E_48, Abu Dhabi
    BEAD Architects
    Abu Dhabi, UAE
    2018
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG Pipework Installation at Mixed used Building On Plot No. 28, Sector No. RBW-2, Al Raha Beach, Abu Dhabi.
    BEAD Architects
    Abu Dhabi, UAE
    2018
  • Provision of Third Party Approval of Conceptual DESIGN STAGE of NG Pipe Work at Plot 11, sector RBW-2, Al-Raha, Abu Dhabi
    MAKAN Consulting
    Abu Dhabi, UAE
    2018
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG and SNG Pipework Installation at Residential Building, Sector RBW-7, Plot C-10, Al Raha Beach, Abu Dhabi.
    Hannover Consulting
    Abu Dhabi, UAE
    2018
  • Provision Of Third Party Review & Verification For Conceptual Design Stage of NG and SNG Pipework Installation At Residential Building, Plot No. 8, Rbw-2, Al Raha Beach, Abu Dhabi.
    Hannover Consulting
    Abu Dhabi, UAE
    2018
  • Provision of Third Party Approval of Conceptual Design of NG Pipework in Residential Building RBW-7, Plot C-24 in Al Raha Beach, Abu Dhabi
    Hannover Consulting Engineers
    Abu Dhabi, UAE
    2017
  • Provision of Third Party Approval for All Three Stages of NG/SNG Pipe work for Residential Tower Plot No C30-C31, RS3, Reem Island, Abu Dhabi
    Universal Consultancy Services
    Abu Dhabi, UAE
    2016
  • Provision of Third Party Approval for All Three Stages of NG/SNG Pipe work for Residential Tower (B+G+ 23 Floors) Plot No C3, RS1, Reem Island, Abu Dhabi
    Universal Consultancy Services
    Abu Dhabi, UAE
    2016
  • “Provision of Third Party Design Approval for Conceptual design stage Documents of NG/SNG Installation in Residential Buildings” for Residential Building, Al Raha beach – Abu Dhabi, Sector No. RBW3, Plot No. C2 Project
    Architecture & Planning Group (AGP)
    Abu Dhabi, UAE
    2015
  • Provision of Third Party Design Approval for Conceptual Design stage Documents of NG/SNG Installation in Residential Buildings” for Residential Building Shams – Abu Dhabi, Sector No. RS-5, Plot No. C-02 Project
    Architecture & Planning Group (AGP)
    Abu Dhabi, UAE
    2015
  • Provision of Third Party Design Approval for Conceptual design stageDocuments of NG/SNG Installation in Buildings.
    GHD Global Ply Ltd.
    Abu Dhabi, UAE
    2015
  • Provision of Third Party Approval of detailed design package and of NG/SNG Installation Pipe work.
    Al Fanar
    Saudi Arabia
    2015