  • Project No: LEG-PRO-03-D01-CTR-03 Inspect ability, Operability & Maintainability Review as a part of AIMS Services for EPC for BAB 485 MBS Sustainable Facilities Project
    Archirodon Construction (Overseas) Co. Ltd / ADNOC Onshore
    Abu Dhabi, UAE
    2021
  • Project No: LEG-PRO-03-D01-CTR-12,13,14 & 15 AIMS (II, III, IV & V) Review as a part for EPC for BAB 485 MBS Sustainable Facilities Project
    Archirodon Construction (Overseas) Co. Ltd / ADNOC Onshore
    Abu Dhabi, UAE
    2021
  • Project No: AA /SC / RUM/AAA/WO/046/060-00/20-CTR-12,13,14 & 15 AIMS (II, III, IV & V) Review as a part of AIMS Services for EPC for Rumaitha Thamama Zone B Phase – III Expansion & Phase-I VRC Replacement Project
    Al ASAB/ ADNOC Onshore
    Abu Dhabi, UAE
    2021
  • Project No: AA /SC / RUM/AAA/WO/046/060-00/20-CTR-03 Inspect ability, Operability & Maintainability Review as a part of AIMS Services for EPC for Rumaitha Thamama Zone B Phase – III Expansion & Phase-I VRC Replacement Project
    Al ASAB/ ADNOC Onshore
    Abu Dhabi, UAE
    2021
  • Project No: AA/SC/OGD0&2/ABK/WO/14/016-00/19-CTR-12,13,14 & 15 AIMS (II, III, IV & V) Review as part of AIMS Services of EPC for OGD-II and OGD-0 in Asab Area
    Al ASAB/ ADNOC Offshore
    Abu Dhabi, UAE
    2020
  • Project No: AA/SC/OGD0&2/ABK/WO/14/016-00/19-CTR-03 Inspect ability, Operability & Maintainability Review as part of AIMS Services of EPC for OGD-II and OGD-0 in Asab Area
    Al ASAB/ ADNOC Offshore
    Abu Dhabi, UAE
    2020
  • Project No: PO-14-00223 Structural Verification And Certification Of Lam-C Platform With Two Additional Wells
    Dragon Oil (Turkmenistan) Ltd – DOTL
    Turkmenistan
    2014
  • Project No: PO-14-01175 Structural Verification And Certification Of LAM-B Platform With Two Additional Wells
    Dragon Oil (Turkmenistan) Ltd – DOTL
    Turkmenistan
    2014
  • Project No: PO-14-02036 Structural Reassessment of Lam-C Platform
    Dragon Oil (Turkmenistan) Ltd – DOTL
    Turkmenistan
    2014
  • Project No: CFT/RC/45/10/512 TPA-1 for LAM-C Platform Project
    Dragon Oil (Turkmenistan) Ltd – DOTL
    Turkmenistan
    2014
  • Project No: CFT/RC/45/10/512 TPA-1 for ZHDANOV-A Platform Project
    Dragon Oil (Turkmenistan) Ltd - DOTL
    Turkmenistan
    2014
  • Project No: CFT/RC/45/10/512 TPA-1 for Subsea Pipelines (14” & 8” ) Project
    Dragon Oil (Turkmenistan) Ltd – DOTL
    Turkmenistan
    2014
  • Project No: MPP080 Constructability Review for ADNOC Sour Gas
    Target Engineering Construction Company L.L.C.
    Abu Dhabi, UAE
    2020
  • Project No: 8300009992/601 Provision of third party design verification to check suitability of end cap material SA-234 instead of existing SA-105.
    Bilfinger Deutsche Babcock Emirates LLC
    Abu Dhabi, UAE
    2020
  • Project No: 8300010178/601 Provision of Third Party Design Verification of Radiant Bundle Supports – H.330189.959 – ADOC Tube Coils
    Bilfinger Deutsche Babcock Emirates LLC
    Abu Dhabi, UAE
    2020
  • Project No: LPO-2020-5012-VCS Provision of Third Party Design Review Services For Lifting Lug of Bulk Sulphuric Bowser Tank (As Per BS EN ISO 10855-1:2018)
    Prominent Team Consultancy LLC
    Abu Dhabi, UAE
    2020
  • Project No: 9600041408 Design & Drawing Review for Three (03) Number MEDS skids
    GGME
    Dubai, UAE
    2020
  • Project No: VELPO-0114-2020 Provision of Third Party Design Review of 54 Liter LPG Cylinder As Per ISO 22991 And ADNOC Guidelines.
    Velosi Oman
    Oman
    2020
  • Project No: 570-604129 Provision of Third Party Design Review Services For Pre-Engineered Building Workshop At Fujairah For Structural Integrity Verification
    VTTI Fujairah Terminals Ltd Fzc
    United Arab Emirates UAE
    2020
  • Project No: 590-600612 Provision for Third Party Design Rerate for Vessel (V-601) as per ASME Section VIII DIV. 1 ED. 2017.
    VTTI Fujairah Terminals Ltd FZC
    United Arab Emirates UAE
    2019