Our Experience

  • RBI Study for Saudi Aramco Yanbu SRU Project
    GS Engineering & Construction
    Saudi Arabia
    2025
  • Implementation of RBI System at RA1 K and Provision of RBI Software and Related Services
    SONATRACH
    ALGERIA
    2025
  • RBI/CCD Evergreening & OSI Contract – Saudi Aramco Jazan Refinery – PR # 3001171623
    Saudi Aramco
    Saudi Arabia
    2025
  • AIV Study for Saudi Aramco – Master Gas System Expansion Phase-III Package-2 – Booster Gas Compression Station BGCS-10
    Kent International Arabia Ltd.
    UAE
    2025
  • Risk Based Inspection (RBI) Program for Piping
    Linde Jubail Industrial Gases Factory LLC
    Saudi Arabia
    2025
  • Risk Based Inspection (RBI) Assessment for Fixed Assets and On-Stream Inspection (OSI) Services Contract
    Yanbu Aramco Sinopec Refining Company (YASREF) Ltd.
    Saudi Arabia
    2025
  • Risk Based Inspection (RBI) Assessment for Fixed Assets and On-Stream Inspection (OSI) Services Contract
    Yanbu Aramco Sinopec Refining Company (YASREF) Ltd.
    Saudi Arabia
    2025
  • Risk Based Inspection (RBI) Study for P-2369 – LZ (Lower Zakum), LTDP – 1 (Long Term Development Plan) for NMGL (New Main Gas Line) EPC Project-Variation
    National Petroleum Construction Company (NPCC)
    UAE
    2025
  • Material Selection Report for pre-Feed for spark phase 1-A (H2 Technologies Center & Gas Purification)
    Kent
    Saudi Arabia
    2025
  • Risk Based Inspection (RBI) SW Annual Maintenance Support
    Nawah Energy Company
    UAE
    2025
  • AIV and FIV Studies for EPC of SAHIL Phase III Development Project – ADNOC Onshore
    Target Engineering Construction Company – Sole Proprietorship L.L.C
    UAE
    2025
  • Risk Based Inspection Consultancy for ESTIDAMA Project 2523, Package 6
    NMDC ENERGY
    UAE
    2025
  • AIV/FIV Study for LNG Transmission Pipeline Project
    CHINA PETROLEUM PIPELINE ENGINEERING COMPANY LIMITED-ABU DHABI (CPP)
    UAE
    2025
  • Risk Based Inspection (RBI) Study 033714 ARAMCO LTA#96 ABUSAFA 251-1PD
    SAIPEM S.P.A.
    Saudi Arabia
    2024
  • Purchase Order (PO) for Risk Based Inspection (RBI) Study for Package # 1 of Jafurah Gas Compression Plant, Project of M/s. Saudi Aramco, Saudi Arabia.(Variation No. 1)
    L&T Hydrocarbon
    Saudi Arabia
    2024
  • Risk Based Inspection Consultancy for ESTIDAMA Project 2543
    National Petroleum Construction Company - PJSC (NPCC)
    UAE
    2024
  • Provision of Risk Based Underwater Inspection for CPOC Subsea Pipeline and Jacket Structure
    Carigali - PTTEPI Operating Company Sdn. Bhd. (CPOC)
    MalAYSIA
    2024
  • Risk Based Inspection (RBI) Study for LTA 92 – ABSF 270/279 and MRJN 508, 2201/2209
    SAIPEM S.P.A.
    Saudi Arabia
    2024
  • AIV / FIV Analysis for Re-Select and FEED Services For Nasr 100MBD Project Phase 2 for ADNOC Offshore
    Technip Energies France - Abu Dhabi
    UAE
    2024
  • DATA ACQUISITION, CIRCUITIZATION, RBI ANALYSIS & INSPECTION PLANNING FOR QATARENERGY REFINERY MESAIEED
    QatarEnergy
    Qatar
    2024
  • Provision of Service for Risk Based Inspection (RBI) Study for 20″ MOL from UMM LULU to ZIRKU Island Project No. 2683
    National Petroleum Construction Company - PJSC (NPCC)
    UAE
    2024