Our Experience

  • Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
    PETRONAS FLNG 1 (L) Ltd
    Malaysia
    2015
  • Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    TAKREER (ADNOC Refining)
    Abu Dhabi, UAE
    2015
  • Project No: VQ/40169 ITAS-SPA-Lifting calculation Review
    Qatar Petroleum
    Qatar
    2015
  • Project No: 5809100625 Detail Design of Monorail Beams
    Emirates Steel Industries
    Abu Dhabi, UAE
    2015
  • Structural Integrity Assessment & Life Extension Study for EB-37
    Bunduq Company Ltd
    United Arab Emirates UAE
    2015
  • Third party QSHE (Quality, Safety, Health & Environment) & House Keeping Audit at 09 PARCO & PARCO Stations and Terminal
    Pak-Arab Refinery Limited (PARCO)
    Pakistan
    2015
  • Third Party Services for Drops Survey of Onshore Rigs 2015 Call Out Basis KCA Deutag Drilling G.M.B.H Islamabad
    KCA Deutag Drilling G.M.B.H Islamabad
    Pakistan
    2015
  • SIL Study for All Operating Units at QP Refinery , Mesa
    Qatar Petroleum
    Qatar
    2015
  • Basic Engineering Study for Fire Risk Assessment Implementation (Phase-1)
    ADOC Abu Dhabi Oil Co. Ltd. (Japan)
    United Arab Emirates UAE
    2015
  • “Provision of Third Party Design Approval for Conceptual design stage Documents of NG/SNG Installation in Buildings. “
    HEBERGER ENGINEERING
    Abu Dhabi, UAE
    2015
  • Project No: 12423 Design Review and Approval of Lifting Frame & Lifting Beam (01. No)
    Velath Engineering International FZC
    United Arab Emirates UAE
    2015
  • Consultancy Services for Updating Operating Manual for Abu Dhabi Refinery
    TAKREER
    United Arab Emirates UAE
    2015
  • Provision of Risk Based Inspection (RBI) Study for Structure and Pipelines for Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    Malaysia
    2015
  • Fire and Gas Equipment Audit Of Mol Production Facilities
    MOL Pakistan Oil & Gas Co. B.V.
    Pakistan
    2015
  • HAZOP Study
    Cylingas Company LLC
    United Arab Emirates UAE
    2015
  • Provision of Third Party Approval of Conceptual Design Package of NG/SNG Installation Pipe work
    Arabian UniGaz
    Abu Dhabi, UAE
    2015
  • Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    TAKREER
    Abu Dhabi, UAE
    2015
  • Project No: AS-M139-P39484A Third Party services for Structural Integrity Study of Lifting Arrangements
    Dhafir Technologies
    Abu Dhabi, UAE
    2015
  • Provision of complete design package for MSV Skid including piping stress analysis.
    VANGUARD ENGINEERING & OIL FIELD
    Abu Dhabi
    2015
  • Consultancy Services for HSE & Fire Quantitative Risk Assessment Study at Dukhan Fields
    Qatar Petroleum
    Qatar
    2015
  • Provision of Risk Based Inspection (RBI) Study for Structure and Pipelines for Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    CPOC
    Malaysia
    2015