Our Experience

  • Risk Based Inspection for Jazan Project for SAIPEM (Equipment & Piping)
    SAIPEM
    Italy
    2016
  • Provision Of Fitness For Services (FFS) Assessment Of Pipeline For Petronas Carigali Sdn Bhd- Sabah Operations
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: TES/8695-Rev-1 Third Party Design Review & Approval Of Mechanical, Structural & Thermal Calculations And Drawings Of Tes Tank (Item# Tes-01) As Per Awwa D100
    TANKLINE
    Abu Dhabi, UAE
    2016
  • Risk Based Inspection (RBI) at Jazan Refinery & Terminal Project for Hyundai Arabia Limited
    Hyundai Arabia Limited
    Saudi Arabia
    2016
  • Project No: 9500057958 Design documents review for Lifting calculation, lifting drawing
    Qatar Petroleum
    Qatar
    2016
  • QRA Study as part of Phase 2 & 3 Health, Safety and Environmental Impact Assessment (HSEIA) Study for BeAAT Expansion Project – Project No. 5649
    Abu Dhabi National Oil Company (ADNOC) Refining
    United Arab Emirates UAE
    2016
  • Order No. 3620292876 Pipeline Engineering Consultancy PL196 Fitness for Services (FFS ) as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: GBEP/1307 Design Review of Basket Structures (4 nos.)
    Green Bridge Engineering
    Abu Dhabi, UAE
    2016
  • Conduct Risk Based Inspection at Manifa Producing Facilities (MPD) for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2016
  • Project No: AS-M141-P44500-R1 Design validation of Detail Engineering Documents As A Engineering Subcontractor For additional Outfall Pipeline & Interconnecting Piping for Ruwais refinery (East)
    Dhafir Technologies LLC.
    Abu Dhabi, UAE
    2016
  • Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
    PETRONAS FLNG 1 (L) Ltd
    Malaysia
    2015
  • SIMOPS Workshop for GASCO Project No. 5627 Additional Nitrogen to TAKREER RRD
    Integrated Specialized Gen. Cont. Co. W.L.L. (ISCCO)
    United Arab Emirates UAE
    2015
  • Risk Based Inspection (RBI) Assessment on K44 & K83-100 for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2015
  • Provision of Third Party Approval of All 3 Stages of NG/SNG Installation Pipe work in Residential Building
    Arkiteknik International
    United Arab Emirates UAE
    2015
  • Project No: BAE/VCS/SC/2015/0044 Design of Blast Proof Building Inside Ruwais refinery (Takreer)
    Bin Asheer Transport and General
    Abu Dhabi, UAE
    2015
  • Stress analysis of Gas Pipeline , Southern header and Northern header at SUI Balochistan.
    Pakistan Petroleum Limited
    Pakistan
    2015
  • Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
    PETRONAS Floating LNG 1 (L) Ltd.
    Malaysia
    2015
  • QRA Study as part of Health, Safety and Environmental Impact Assessment (HSEIA) Study for Waste Heat Recovery Project – Project No. 6143
    Abu Dhabi National Oil Company (ADNOC) Refining
    United Arab Emirates UAE
    2015
  • HSE Audit Surveys at Onshore & Offshore Rigs
    National Drilling Company (NDC)
    Abu Dhabi, UAE
    2015
  • Provision of Third Party Design Approval for Conceptual Design Stage of NG/SNG Installation in Residential Tower
    APG Arch Planning Group
    Abu Dhabi, UAE
    2015
  • Consultancy Services for carrying Fitness for Services and Remaining Life Assessment of Ammonia 1 & 2 Equipment and Structure
    Qatar Fertiliser Company (QAFCO)
    Qatar
    2015