Our Experience

  • PSM & HSE Audit for TAKREER Refineries. / including ADNOC Energy Complex Building.
    TAKREER
    Abu Dhabi, UAE
    March 2010
  • External Audit on Process Safety Management System in Olefins (EU2), Poly-Olefins Olefins (PE3) for Year 2013
    BOROUGE
    Abu Dhabi, UAE
    December 2013
  • Fire and Gas Equipment audit for MOL Production Facilities
    MOL PAKISTAN OIL AND GAS CO.
    Pakistan
    June 2015
  • Price Audit Services Contract
    Inter State Gas System (ISGS) Private Limited
    Pakistan
    January 2013
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD
    Binh SON Refining & Petrochemical CO. LTD (BSR)
    Vietnam
    2014
  • Third party QSHE & House Keeping Audit at 09 PARCO & PARCO Stations and Terminal
    Pak-Arab Refinery Limited (PARCO)
    Pakistan
    March 2015
  • Integrity & HSE Study for 70 Petrol Station of QATAR Petroleum
    Qatar Petroleum
    QATAR
    December 2010
  • EPIC Contract Performance Assessment audit for Dragon Oil Turkmenistan.
    Dragon Oil (Turkmenistan) Ltd - DOTL
    Turkmenistan
    January 2011
  • HSE Audit Survey at Onshore & Offshore Rigs
    National Drilling Company (NDC)
    Abu Dhabi, UAE
    2017
  • HSE Audit Surveys at Onshore & Offshore Rigs
    National Drilling Company (NDC)
    Abu Dhabi, UAE
    2015
  • Development of A Study on The Compliance of Installations and Equipment of The OHANET Regional Department
    SONATRACH
    Algeria
    December 2021
  • Realization of the technical diagnosis and development of an Implementation program According to hydrocarbons installations of the Transport Regions Central (RTC), West (RTO), and East (RTE)
    SONATRACH
    Algeria
    July 2021
  • Borouge Inspection & Corrosion Management System Audit
    BOROUGE
    United Arab Emirates UAE
    February 2021
  • Development of a Study for the Compliance of the Facilities and Equipment of Regional Management STAH
    SONATRACH
    Algeria
    33 Weeks
  • HSE Critical Integrity Verification for TAKREER Facilities
    TAKREER
    Abu Dhabi, UAE
    May 2019
  • Process Safety Management (PSM) Evaluation & Benchmarking Study at PPL
    Pakistan Petroleum Limited
    Pakistan
    March 2018
  • Technical Audit of Sui Northern Gas Pipelines Limited
    Sui Northern Gas Pipelines Ltd. (SNGPL)
    Pakistan
    November 2018
  • Technical Audit of Sui Northern Gas Pipelines Limited
    Sui Northern Gas Pipelines Ltd. (SNGPL)
    Pakistan
    February 2008
  • Consultancy Services for Periodic Equipment Integrity Review (PEIR)
    Abu Dhabi National Oil Company (ADNOC)
    Abu Dhabi, UAE
    March 2013
  • Independent Audit Verification for HSECES at ADRD and RRD
    TAKREER
    Abu Dhabi, UAE
    December 2012
  • 1
  • 2