Our Experience

  • Project No: TES/8695-Rev-1 Third Party Design Review & Approval Of Mechanical, Structural & Thermal Calculations And Drawings Of Tes Tank (Item# Tes-01) As Per Awwa D100
    TANKLINE
    Abu Dhabi, UAE
    2016
  • Risk Based Inspection (RBI) at Jazan Refinery & Terminal Project for Hyundai Arabia Limited
    Hyundai Arabia Limited
    Saudi Arabia
    2016
  • Project No: 9500057958 Design documents review for Lifting calculation, lifting drawing
    Qatar Petroleum
    Qatar
    2016
  • QRA Study as part of Phase 2 & 3 Health, Safety and Environmental Impact Assessment (HSEIA) Study for BeAAT Expansion Project – Project No. 5649
    Abu Dhabi National Oil Company (ADNOC) Refining
    United Arab Emirates UAE
    2016
  • Order No. 3620292876 Pipeline Engineering Consultancy PL196 Fitness for Services (FFS ) as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: GBEP/1307 Design Review of Basket Structures (4 nos.)
    Green Bridge Engineering
    Abu Dhabi, UAE
    2016
  • Conduct Risk Based Inspection at Manifa Producing Facilities (MPD) for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2016
  • Project No: AS-M141-P44500-R1 Design validation of Detail Engineering Documents As A Engineering Subcontractor For additional Outfall Pipeline & Interconnecting Piping for Ruwais refinery (East)
    Dhafir Technologies LLC.
    Abu Dhabi, UAE
    2016
  • Provision of Third Party Approval for All Three Stages of NG/SNG Pipe work for Residential Tower Plot No C30-C31, RS3, Reem Island, Abu Dhabi
    Universal Consultancy Services
    Abu Dhabi, UAE
    2016
  • Order No. 3620287133 PL202 Fitness for Services (FFS ) + Life extension assessment Study (LEA) Pipeline Intelligent Pigging as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: AQ/42064 Design documents review for Heater bundle-Lifting calculation, lifting drawing and its procedure.
    Qatar Petroleum
    Qatar
    2016
  • BeAAT Expansion Project- Phase 2 & 3 Health Safety and Environmental Impact Assessment (HSEIA) Study for ADIA-Project NO.5649
    TAKREER
    Abu Dhabi, UAE
    2016
  • Updating of ADCO Corporate Inspection Management System Procedure Document
    Australian Building Construction Company - ADCO
    United Arab Emirates UAE
    2016
  • RBI Equipment Assessment for ORYX GTL
    ORYX GTL
    Qatar
    2016
  • Project No: ABE-12040 Design Review & Appraisal of Lifting Design Calculation & Details for Plate Girder Assembly
    Albanna Engineering LLC.
    Dubai, UAE
    2016
  • Technical Integrity Verification Services
    Shell Iraq Petroleum Development B.V.
    Iraq
    2016
  • Provision of Third Party Approval for All Three Stages of NG/SNG Pipe work for Residential Tower (B+G+ 23 Floors) Plot No C3, RS1, Reem Island, Abu Dhabi
    Universal Consultancy Services
    Abu Dhabi, UAE
    2016
  • Order No. 3620287345 PL269 Fitness for Services (FFS ) + Life extension assessment Study (LEA) Pipeline Intelligent Pigging as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: TAS/APV/ CL2/04-16/T&C/0001 Building Civil Work Quality Audit Support (For Design Review & Site Supervision scope of RFP)
    Thales Advanced Solutions Ltd
    United Arab Emirates UAE
    2016
  • Risk Contributor Assessment Study For MAF Refinery
    Oman Oil Refineries and Petroleum Industries Company - ORPIC
    Oman
    2016
  • Project No: ABE-12630 Review & Appraisal of J628-MS – Lifting Plan for Girder Erection.
    Albanna Engineering LLC.
    Dubai, UAE
    2016