Our Experience

  • Integrity Inspection of Natural Gas System Piping for D, E, G, K & H Stations Dubai Electricity and Water Authority (DEWA)
    Dubai Electricity and Water Authority (DEWA)
    United Arab Emirates UAE
    2017
  • Project No: JR-000613-2017 Certification of Structural Calculation for Aluminium Canopy Structure
    Alba Tower Aluminum
    United Arab Emirates UAE
    2017
  • Risk Based Inspection (RBI) program implementation
    BRUNEI METHANOL COMPANY (BMC)
    Brunei
    2017
  • Project No: 9500075879 Lifting Procedure, Lifting Calculation and Lifting Arrangement Drawing Review
    Qatar Petroleum
    Qatar
    2017
  • Project No: 90000281153 Structural Assessment of National Emergency Center
    Musanada
    United Arab Emirates UAE
    2017
  • HSE Audit Survey at Onshore & Offshore Rigs
    National Defence Complex NDC
    United Arab Emirates UAE
    2017
  • Project No: 9500085656 Lifting Lug Calculations & Test Procedure for each valve
    Qatar Petroleum
    Qatar
    2017
  • Provision of Asset Integrity Management Services for Block-60
    Oman Oil Company Exploration & Production LLC (OOCEP)
    Oman
    2017
  • Provision of Third Party Approval of Conceptual Design of NG Pipework in Residential Building RBW-7, Plot C-24 in Al Raha Beach, Abu Dhabi
    Hannover Consulting Engineers
    Abu Dhabi, UAE
    2017
  • Third Party Design Review of Structural Design Calculation, Anchor bolt layout, Anchor bolt reactions, Main frame cross section, Roof framing plan, Sidewall framing elevation, End wall framing elevation, Architectural Plan & Elevations.
    TAKREER
    Abu Dhabi, UAE
    2017
  • Provision of Third Party Approval for All Three Stages of NG/SNG Pipe work for Residential Tower Plot No C30-C31, RS3, Reem Island, Abu Dhabi
    Universal Consultancy Services
    Abu Dhabi, UAE
    2016
  • Order No. 3620287133 PL202 Fitness for Services (FFS ) + Life extension assessment Study (LEA) Pipeline Intelligent Pigging as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: AQ/42064 Design documents review for Heater bundle-Lifting calculation, lifting drawing and its procedure.
    Qatar Petroleum
    Qatar
    2016
  • BeAAT Expansion Project- Phase 2 & 3 Health Safety and Environmental Impact Assessment (HSEIA) Study for ADIA-Project NO.5649
    TAKREER
    Abu Dhabi, UAE
    2016
  • Updating of ADCO Corporate Inspection Management System Procedure Document
    Australian Building Construction Company - ADCO
    United Arab Emirates UAE
    2016
  • RBI Equipment Assessment for ORYX GTL
    ORYX GTL
    Qatar
    2016
  • Project No: ABE-12040 Design Review & Appraisal of Lifting Design Calculation & Details for Plate Girder Assembly
    Albanna Engineering LLC.
    Dubai, UAE
    2016
  • Technical Integrity Verification Services
    Shell Iraq Petroleum Development B.V.
    Iraq
    2016
  • Provision of Third Party Approval for All Three Stages of NG/SNG Pipe work for Residential Tower (B+G+ 23 Floors) Plot No C3, RS1, Reem Island, Abu Dhabi
    Universal Consultancy Services
    Abu Dhabi, UAE
    2016
  • Order No. 3620287345 PL269 Fitness for Services (FFS ) + Life extension assessment Study (LEA) Pipeline Intelligent Pigging as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: TAS/APV/ CL2/04-16/T&C/0001 Building Civil Work Quality Audit Support (For Design Review & Site Supervision scope of RFP)
    Thales Advanced Solutions Ltd
    United Arab Emirates UAE
    2016