Our Experience

  • Dynamic Stress analysis for gas piping to evaluate vibration fatigue as a part of Vibration Risk Assessment of Dragon Oil Onshore (CPSF) and Offshore Production Assets (LAM-28 and LAM-A)Turkmenistan
    Dragon Oil (Turkmenistan) Ltd – DOTL
    Turkmenistan
    2018
  • Project No: 8300007767/601 Provision of Design Verification To Verify Material Grade Changes of Evaporator Tubes In Which The Existing Material of SA-178 Gr. A is Replaced With Available Material of SA-178 Gr. C.
    Bilfinger Deutsche Babcock Emirates LLC
    Abu Dhabi, UAE
    2018
  • Decommissioning Environmental Management Plan (DEMP) Preparation of DEMP in accordance with EAD’s Technical Guidance Document for Decommissioning Environmental Management Plan (DEMP).
    National Marine Dredging Company (NMDC)
    Abu Dhabi, UAE
    2018
  • SIC_013 – Out Fall Condition Assessment
    ASHGHAL
    Qatar
    2018
  • Preparation of diagnostic reports in accordance with Algerian regulatory requirements, SONATRACH standards and international standards and good practices.
    SONATRACH
    Algeria
    2018
  • Project No: 41807581/0 Condition Assessment of Portacabin at DWC AMIA (IN181203)”
    Dubai Airports Engineering Services DWC
    Dubai, UAE
    2018
  • Development of Construction Environment Management Plan (CEMP) for Asset Enhancement Scheme – Construction of Deep Gravity Lines to Link Samha and Shahama Areas with Lines Near Ps 7/2-Area 1 Part 3
    MACE Contractors
    United Kingdom
    2018
  • Integrity Management Software Deployment
    Dragon Oil Turkmenistan Limited (DOTL)
    UAE & Turkmenistan
    2018
  • Project No: T3137 Approval of Structural Design and Drawings of CPS 06 E House
    TECHNOMAK Energy International
    Abu Dhabi, UAE
    2018
  • LTC-C-VEN-2385-15 – Concrete Cracks Diagnostic, Repair Works For Sea Water Intake Structure In QG1
    QATARGAS
    Qatar
    2017
  • Risk Based Inspection Study (RBI) For ARBI 20/23 Gas Wellhead Project
    SAIPEM
    Saudi Arabia
    2017
  • Project No: 63873 RAK Precast FZC PCC Concrete pipe rack structure
    RAK Precast FZC ORPIC Plastics LLC
    United Arab Emirates UAE
    2017
  • HAZOP & HAZID Study of Bulk Liquid Storage Facility at Salalah Port,
    Mina Petroleum L.L.C.
    Oman
    2017
  • Pro-forma Call – Off Order No. PCO/HSEIA/17/ 001 – Provision of HSEIA (Phase 1) for CBMB FEED Services Project (PO/725)
    BOROUGE
    Abu Dhabi, UAE
    2017
  • Asset Integrity Management Services for OOCEP (Equipment, piping, PSVs and Pipelines)
    Oman Oil Company Exploration & Production LLC (OOCEP)
    Oman
    2017
  • Asset Integrity Management Services for OOCEP (Equipment, piping, PSVs and Pipelines)
    Oman Oil Company Exploration & Production LLC (OOCEP)
    Oman
    2017
  • Project No: 90000271139 Progress Report W6 – Structural Assessment Slaughterhouse in Abu Dhabi
    Musanada
    Abu Dhabi, UAE
    2017
  • Pipeline Integrity Management Program
    Sui Northern Gas Pipeline Limited (SNGPL)
    Pakistan
    2017
  • Facilitator & Scribe Services for HAZID and Constructability Review, Ghana
    Velosi Ghana Ltd
    Ghana
    2017
  • Baseline Risk Based Inspection (RBI) Passport for NASR Package-2 Project
    Baseline Risk Based Inspection (RBI) Passport for NASR Package-2 Project
    Korea/UAE
    2017
  • HSE Audit Survey at Onshore & Offshore Rigs.
    NDC (National Drilling Company)
    Abu Dhabi, UAE
    2017