Our Experience

  • Consultancy Services for Wrench Time Study for Plant Maintenance at Ruwais Refinery
    TAKREER
    UAE
  • Qualitative Risk Assessment (QRA) Studies for Salalah LPG Project
    OGC
    Oman
  • BGP Study for CMP
    Saudi Aramco
    Saudi Arabia
  • CMMS System Development for Offshore EPRS
    Dolphin Energy
    UAE
  • Provision of Phase 5 Risk Based Inspection Study (RBI)
    Carigali-PTTEPI Operating Company Sdn Bhd (CPOC)
    MalAYSIA
  • Inspection of Musanada Buildings
    Musanada
    United Arab Emirates UAE
    July 2016
  • Independent Audit Verification for HSECES at ADRD and RRD
    TAKREER
    Abu Dhabi, UAE
    December 2012
  • Song Doc Project (Oil & Gas Project )- Block 46/02- It is about 170km offshore, Vietnam, operated by Truong Son Joint Operating Company (TSJOC). The Song Doc field facilities comprise an FPSO and wellhead platform.
    Truong Son JOC
    Vietnam
    December 2008
  • SIL Assessment and Verification as part of Provision of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
    Bashayer Pipeline Company (BAPCO)
    Dubai, UAE
    In Progress
  • Providing SAP Templates– CMMS Services for IWMP PROJECT in Dolphin Energy Limited
    Qatar Engineering & Construction W.L.L/ Dolphin Energy Limited
    Qatar
    July 2017
  • Risk Based Inspection Study for following assets
    Dolphin Energy Limited, UAE
    United Arab Emirates UAE
    March 2015
  • VAIL Plant Software License Agreement Extension for EIRMS & PSVMS Modules for 3 Years
    Dragon Oil Turkmenistan Limited (DOTL)
    UAE & Turkmenistan
    In Progress
  • FFS & Life Extension Study for Bunduq Platform Structures, EB-07, EB-08, EB-09 and EB-10
    Bunduq Company Ltd
    Abu Dhabi, UAE
    November 2015
  • QRA study as part of Master Agreement for Integrated HSEIA and Safety Studies for Ghasha Concession – CTR-01
    Abu Dhabi National Oil Company (ADNOC) Upstream
    United Arab Emirates UAE
    April 2021
  • Provision of Risk Based Inspection (RBI) Assessment for Phase 4 Top Side Vessels, Pipings, Structures and Underwater Pipelines for Block B-17-01
    Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    Malaysia
  • Consultancy Services For Evaluating The Integrity of Existing Oily Sewer System in Ruwais Refinery including preparation of As-Built Drawings
    ADNOC Refining (TAKREER)
    Abu Dhabi, UAE
    December 2011
  • Consultancy Services for the Design of Fire Detection System at Roshanpura Depot
    Pakistan Tobacco Company Limited
    Pakistan
    In Progress
  • “Provision of Third Party Design Approval for Conceptual design stage Documents of NG/SNG Installation in Buildings.”
    HEBERGER ENGINEERING
    Abu Dhabi, UAE
    July 2015
  • Dragon Oil- Evaluation of EPIC Contractor Performance
    Dragon Oil
    UAE
  • Provision of Consultancy for Field Reliability Availability, Maintainability (RAM) Model Development using MAROS for PETRONAS Carigali Sdn Bhd- Sarawak Operations
    PETRONAS
    Malaysia
  • RBI 2nd Phase for Dung Quat Refinery
    BSR
    Vietnam