Our Experience

  • Preparation of Facility Integrity Management (FIMS) Inspection Procedures in line ADNOC Guidelines.
    Bunduq Company Ltd
    Abu Dhabi, UAE
    2014
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD
    Binh SON Refining & Petrochemical CO. LTD (BSR)
    Vietnam
    2014
  • KPOC CTR 006C Preparation of Inspection Drawings for Topside Piping System and Equipments
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Project No: CFT/RC/45/10/512 TPA-1 for ZHDANOV-A Platform Project
    Dragon Oil (Turkmenistan) Ltd - DOTL
    Turkmenistan
    2014
  • Order Number: 3620015973 MOB OF RAM ENGR & RAM CONSLTCY (BAKAU) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014
  • Provision of Third Party Design Approval for detailed stage NG/SNG System
    Al Fanar
    Saudi Arabia
    2014
  • Work Pack of Topside for Bravo Platform plus Processing and Power Module
    Salamander Energy
    Thailand
    2014
  • Norm Handling Treatment and Disposal Project at BeAAT Project No.5640 Phase 2&3 (HSEIA) Study.
    TAKREER (ADNOC Refining)
    Abu Dhabi, UAE
    2014
  • KPOC CTR 006D Preparation of Inspection Drawings for Pipelines and Risers
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Project No: CFT/RC/45/10/512 TPA-1 for Subsea Pipelines (14” & 8” ) Project
    Dragon Oil (Turkmenistan) Ltd – DOTL
    Turkmenistan
    2014
  • Order Number: 3610078194 MOB OF RAM ENGINEER & RAM CONS.(D18) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014
  • Third Party Design Approval for detailed stage NG/SNG System
    Al Fanar
    Saudi Arabia
    2014
  • Integrity Management Support Services for EQUION Energy Limited.
    EQUION Energy Limited.
    Colombia
    2014
  • QRA Studies for Salalah LPG Project
    Oman Gas Company S.A.O.C. (OGC)
    Oman
    2014
  • Pipeline Integrity Assessment and Life Extension Study for 6 Nos. Pipelines
    Bunduq Company Ltd
    United Arab Emirates UAE
    2014
  • Development, Implementation and Support of Risk Based Inspection Programs for Field Production Facilities of the Qurana -2 Field in Iraq
    Luk Oil Middle East Ltd.
    Iraq
    2014
  • Order Number: 3610078194 MOB OF RAM ENGINEER & RAM CONS.(BAYAN) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014
  • Provision of Third Party Approval (Detailed design stage) of SNG/NG service pipeline & Installation Pipe work
    Qenergy
    Australia
    2014
  • Conduct an RBI Services for Yanbu Refinery for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2014
  • Development and Implementation of an integrated maintenance and reliability system (MRS) for Murphy’s operations
    Murphy
    Malaysia
    2014
  • KPOC CTR 001A Pipeline RBI Study-crude
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014