Our Experience

  • Provision of Third Party Design Approval for Conceptual Design Stage of NG/SNG Installation in Residential Tower
    APG Arch Planning Group
    Abu Dhabi, UAE
    2015
  • Development, Implementation and Support of Pressure Safety Valves Inspection Management System (PSV IMS) for PSV’s Operated at Production Facilities of the West Qurna-2 Field for Lukoil
    Luk Oil Middle East Ltd.
    Iraq
    2015
  • Risk Based Inspection (RBI) Static Equipment and Piping at Hawiyah GOSP – 3 & Haradh GOSP – 2 & 3 for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2015
  • QRA Study as part of Health, Safety and Environmental Impact Assessment (HSEIA) Study for Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804
    Abu Dhabi National Oil Company (ADNOC) Refining
    United Arab Emirates UAE
    2015
  • “Provision of Third Party Design Approval for Conceptual design stage Documents of NG/SNG Installation in Residential Buildings” for Residential Building, Al Raha beach – Abu Dhabi, Sector No. RBW3, Plot No. C2 Project
    Architecture & Planning Group (AGP)
    Abu Dhabi, UAE
    2015
  • Project No: 06-4098-15 Design Review and Certification of Structural Calculation for Curtain Wall (Ground Floor)
    SKYwall
    India
    2015
  • Provision of Third Party Approval of Conceptual Design Package and of NG/SNG Installation Pipe work.
    Al Fanar
    Saudi Arabia
    2015
  • Reliability Centered Maintenance (RCM) at Chemanol
    Chemanol
    Saudia Arabia
    2015
  • Waste Heat Recovery Project – Project No. 6143 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    TAKREER (ADNOC Refining)
    United Arab Emirates UAE
    2015
  • Risk Based Inspection (RBI) at Jeddah Refinery for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2015
  • Provision of Third Party Design Approval for Conceptual Design stage Documents of NG/SNG Installation in Residential Buildings” for Residential Building Shams – Abu Dhabi, Sector No. RS-5, Plot No. C-02 Project
    Architecture & Planning Group (AGP)
    Abu Dhabi, UAE
    2015
  • Project No: VQ-43391-A Design Review and Certification of Coiling Tower & Cable laying structure
    PCS Cables LLC
    Qatar
    2015
  • HAZID/ENVID/OHRA, Bow Tie, Risk Reduction (ALARP), SIMOPS & MOPO Workshops and Studies
    TAKREER
    United Arab Emirates UAE
    2015
  • Risk Based Inspection Study (RBI) for Dolphin Energy Limited
    Dolphin Energy Limited
    Qatar
    2015
  • Consultancy Services For HSE & Fire Quantitative Risk Assessment Study At Dukhan Fields
    Qatar Petroleum
    Qatar
    2015
  • Condition Assessment for Super Structure of LPG Tanks at Gas Operations, MESAIEED
    Salamander Energy
    Thailand
    2014
  • KPOC CTR 006B Preparation of Inspection Drawings for 8-Legged Subsea Jacket Structure
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Quality and HSE (Health Safety and Environment) Audit Consultancy Pertaining to School by Musanada
    MUSANADA
    Abu Dhabi, UAE
    2014
  • Project No: CFT/RC/45/10/512 TPA-1 for LAM-C Platform Project
    Dragon Oil (Turkmenistan) Ltd – DOTL
    Turkmenistan
    2014
  • Order Number: 3610078194 MOB OF RAM ENGINEER & RAM CONS.(TEMANA) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014
  • KPOC CTR 006B Preparation of Inspection Drawings for 8-Legged Subsea Jacket Structure
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014