Our Experience

  • Variation Order for Consultancy Services For HSE & Fire Quantitative Risk Assessment Study At Dukhan Fields
    Qatar Petroleum
    Qatar
    2017
  • Development, Implementation and Support of Risk Based Inspection Programs for Field Production Facilities of the Qurana -2 Field in Iraq
    LukOil Middle East Ltd.
    Iraq
    2017
  • RBI for (CMP) Finalization
    SK Engineering & Construction
    Saudi Arabia
    2017
  • Project No: PO/17-079 Third Party Design Review & Verification of Mechanical and Structural Design Calculations for One Design of Chilled Water Storage Tank as Per API-650
    TS Tank Contracting L.L.C
    Abu Dhabi, UAE
    2017
  • ATEX ZONING & QRA Study
    Suez Middle East
    United Arab Emirates UAE
    2017
  • Supply Specification for Risk Based Inspection (RBI) Study Karan 52/60, Karan 7, Karan TP-1 Auxiliary Platforms
    SAIPEM
    Saudi Arabia
    2017
  • Project No: PO/17-007 Third Party Design Review & Approval of Mechanical, Structural & Foundation (Ring Wall) Design Calculations and General Arrangement Drawing for One Design of Portable
    TANKLINE
    Abu Dhabi, UAE
    2017
  • LTC-C-VEN-2385-15 – Concrete Cracks Diagnostic, Repair Works For Sea Water Intake Structure In QG1
    QATARGAS
    Qatar
    2017
  • Risk Based Inspection Study (RBI) For ARBI 20/23 Gas Wellhead Project
    SAIPEM
    Saudi Arabia
    2017
  • Project No: 63873 RAK Precast FZC PCC Concrete pipe rack structure
    RAK Precast FZC ORPIC Plastics LLC
    United Arab Emirates UAE
    2017
  • LTC/ ENG/2030/12 -CALL-OFF Contract For The Supply Of Sub-Sea Representative To Oversee The Underwater Inspection Surveys Of All Platforms And Do Condition Monitoring Survey For Offshore Pipelines, Cables And Associated Sub Connection Facilities
    QATARGAS OPERATING COMPANY LIMITED
    Qatar
    2016
  • Order No. 3620287347 PL267 Life extension assessment Study (LEA) PIPELINE INTELLIGENT PIGGING as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: QP-204/53292/2015 Calculation the Strength of Existing Control Room 1 False Floor
    Oil and Gas Development Company Limited
    Abu Dhabi, UAE
    2016
  • Piping stress analysis of off-shore pipeline riser.
    REPSOL, Malaysia
    Abu Dhabi
    2016
  • Development, Implementation and Support of Pressure Safety Valves Inspection Management System (PSV IMS) for PSV’s Operated at Production Facilities of the West Qurna-2 Field for Lukoil
    LukOil Middle East Ltd.
    Iraq
    2016
  • Noise and Emission Testing of Aviation Equipment Based at Peshawar Airport as per NEQ’s requirements.
    Pakistan State Oil Company Limited (PSO)
    Pakistan
    2016
  • Project No: GBH-DXB-16206 Third Party Review of Tower Crane Foundation
    GBH International Contracting LLC
    Dubai, UAE
    2016
  • Consltancy Services For Condition Assessment Of Reinforces Cement Concrete Clarifier And Water Basin Tanks, Dr, Qatar Steel.
    QATAR STEEL
    Qatar
    2016
  • Order No. 3620287350 PL270 Fitness for Services (FFS ) PIPELINE ENGINEERING CONSULTANCY as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: 50443 Third Party Review And Approval Of Spreader Beam
    PETROSERV Limited
    Qatar
    2016
  • Perform piping stress analysis of chiller piping in order to evaluate piping loads used in design calculations of pipe supports by Vendor and review & certification of pipe supports design calculations for chiller piping provided by the Vendor
    Genric Engineering Technologies
    QATAR
    2016