Our Experience

  • SIL level assessment is the second project, in which Akzo have already assigned SIL levels to limit switches and need to be verified as subject expert, as it’s the requirement of Akzo to verify from expert for it to be termed as approved.
    AKZO NOBEL PAKISTAN LIMITED
    Pakistan
    2020
  • Environmental Monitoring & Testing of GRC1
    Fibrex Construction LLC (GRC-1)
    Abu Dhabi, UAE
    2020
  • HAZOP Workshops and SIL Assessment and Verification
    Dragon Oil
    UAE
    2020
  • Provision of HSE Specialised and Multidisciplinary Services
    Eni Abu Dhabi BV
    UAE
    2020
  • Environmental Impact Assessment (EIA) for 20-173 Island House, Abu Dhabi, UAE Variation No. 1
    DSA Architects International
    UAE
    2020
  • Environmental Monitoring & Testing
    ADNC
    UAE
    2020
  • Update Operating Manuals & Procedures (OP & MS) for ADCO Fields, Terminals & Pipelines-Full Implementation Across ADCO Assets (Phase II) for SHAH / QUSAHWIRA / MENDER Contract No. 16079.02
    ADCO
    United Arab Emirates UAE
    2020
  • RBI Assessment Integrity Services for VAIL-Plant® PIMS, SIMS and PEMS for LAM -13, LAM-63 and Block 4 at Caspian Sea
    Dragon Oil Turkmenistan Limited (DOTL)
    UAE & Turkmenistan
    2020
  • Environmental Impact Assessment (EIA) for their Existing Facility in Jebel Ali
    EMIRATES LIVESTOCK & MEAT PRODUCTS TRADING COMPANY LLC
    Dubai, UAE
    2020
  • APMP (Asset Performance Management Program) Study for Ras Tanura Clean Fuels Project Package-1 (WORK ORDER No: I101001006 Add3)
    TÉCNICAS REUNIDAS
    Spain
    2020
  • SOW-EIRMS Implementation Services for Lam-C, Lam-22, Lam-13 and Lam-63 Offshore Platforms Using EIRMS Module
    Dragon Oil
    UAE
    2020
  • Additional HSE Studies As a part of Hiring of services for Environment Impact assessment studies & Preparation of Community Engagement Plan for Wells Drilling and Testing Operations in Onshore Block 1, UAE
    Urja Bharat Private Ltd
    UAE
    2020
  • HSE Studies for EPC for Provision and Installation of New Bypass System at MP-21 and Removal of Redundant Lines at Old Mp-21 Station
    Galfar Engineering & contracting WLL Emirates
    UAE
    2020
  • HSEIA STUDY REPORT FOR WELL DRILLING OPERATIONS IN ONSHORE BLOCK-1, ABU DHABI, U.A.E.
    Urja Bharat
    United Arab Emirates UAE
    2020
  • Mangrove Health Survey
    NATIONAL MARINE DREDGING COMPANY
    Abu Dhabi, UAE
    2020
  • Environmental Monitoring & Testing
    APT GLOBAL MARINE SERVICES LLC
    Abu Dhabi, UAE
    2020
  • Consultancy Services For Remaining Life Assessment & Fitness For Service Study
    Qatar Fertilizer Company (QAFCO)
    Qatar
    2020
  • Construction Environmental Management Plan (CEMP) for Shams Development District Cooling Plant (DCP)
    ADC Energy Systems
    UAE
    2020
  • Environmental Monitoring & Testing for ICAD 1
    Al Shoumoukh Group
    UAE
    2020
  • Consultancy Services for Operation Health, Safety & Environmental Impact Assessment (HSEIA) Study
    ADNOC Distribution
    United Arab Emirates UAE
    2020
  • Preliminary Envinmental Review (PER) for Upgrading of the Road Al Fayato Seih Shuaib E75
    ITALCONSULT
    Dubai, UAE
    2020