  • APMP (Asset Performance Management Program) Study for Ras Tanura Clean Fuels Project Package-1 (WORK ORDER No: I101001006 Add2)
    TÉCNICAS REUNIDAS
    Spain
    2019
  • Asset Integrity Management System for ADNOC EPC for ASAB Phase-II, Stage-1 Project
    AL ASAB
    UAE
    2019
  • Design Endorsement of Crude Oil Tank (T-1501) calculations during Desludging
    Dhafir Technologies L.L.C
    UAE
    2019
  • HAZOP&SIL Workshop and Report SRU (UNIT 106) Replacement Project at Ruwais
    Wison Engineering
    United Arab Emirates UAE
    2019
  • Development of Construction Environment Management Plan (CEMP) for Asset Enhancement Scheme – Construction of Deep Gravity Lines to Link Samha and Shahama Areas with Lines Near Ps 7/2-Area 1 Part 3
    MACE Contractors
    United Kingdom
    2018
  • Project No: T3137 Approval of Structural Design and Drawings of CPS 06 E House
    TECHNOMAK Energy International
    Abu Dhabi, UAE
    2018
  • Integrity Management Software Deployment
    Dragon Oil Turkmenistan Limited (DOTL)
    UAE & Turkmenistan
    2018
  • Environmental Impact Assessment (EIA) Study of Animal Breading Farm Suweihan Area Plot no 57-05-801-330
    Emirates Future
    Abu Dhabi, UAE
    2018
  • Project No: VELPO/0371/2018 Provision of Third Party Design Review of Three (03) LPG Cylinders As Per ISO 22991 and ADNOC Guidelines.
    Velosi Oman
    Oman
    2018
  • HAZOP Study for RTALPD
    Specialized Technologies L.L.C
    Saudi Arabia
    2018
  • Project No: PO/18-003-005 Third Party Design Review & Verification of Mechanical and Structural Design Calculations and GA drawing only for One Design of TES Tank as per AWWA D100
    TS Tank Contracting L.L.C
    Abu Dhabi, UAE
    2018
  • Risk Based Inspection of stationery equipment at Sui Field Location
    Pakistan Petroleum Limited (PPL)
    Pakistan
    2018
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG / SNG Pipework Installation at Residential Building Plot C28, Sector E_48, Abu Dhabi
    BEAD Architects
    Abu Dhabi, UAE
    2018
  • Project No: T3122 Design Review and Verification for Auxiliary Structure of V7841 & V9133.
    TECNIMONT
    Italy
    2018
  • Risk Based Inspection (RBI) Program Implementation
    BRUNEI METHANOL COMPANY (BMC)
    Brunei
    2018
  • Phase 2 & 3 Health Safety and Environmental Impact Assessment (HSEIA) Study for ADIA – Project No.5643
    TAKREER (ADNOC Refining)
    United Arab Emirates UAE
    2018
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG Pipework Installation at Mixed used Building On Plot No. 28, Sector No. RBW-2, Al Raha Beach, Abu Dhabi.
    BEAD Architects
    Abu Dhabi, UAE
    2018
  • Provision of Third Party Approval of Conceptual DESIGN STAGE of NG Pipe Work at Plot 11, sector RBW-2, Al-Raha, Abu Dhabi
    MAKAN Consulting
    Abu Dhabi, UAE
    2018
  • Corrosion Management Program & RBI Study (Project 6285) for Fabrication And Installation Of (Sfny, Zulf And Brri) SSS Decks & Topsides Tie-Ins, Offshore Pipelines, Submarine Cables
    National Petroleum Construction Company (NPCC)
    United Arab Emirates UAE
    2018
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG and SNG Pipework Installation at Residential Building, Sector RBW-7, Plot C-10, Al Raha Beach, Abu Dhabi.
    Hannover Consulting
    Abu Dhabi, UAE
    2018
  • Provision for Generation of Design Calculations & Drawings of One Demo Pressure Vessel For Alteration Job As Per ASME Section VIII DIV. 1 ED. 2017 and to Present Design Engineer During Audit.
    GASCO Abu Dhabi Gas Industries Ltd
    Abu Dhabi, UAE
    2018