Our Experience

  • Corrosion Risk Assessment Study (CRAS) for Front End Engineering & Design Services of Refinery off Gases Recovery Project
    TECNICAS REUNIDAS
    UAE
    2023
  • Reliability Availability And Maintainability Study (RAM) for Front End Engineering & Design Services of Refinery Off Gases Recovery Project
    TECNICAS REUNIDAS
    UAE
    2023
  • Provision of Corrosion Specialist Consulting Service
    ADNOC Onshore
    UAE
    2023
  • Risk Based Inspection Study (RBI) – for ADNOC Project 2136 – Umm Al Dalkh Early Production Scheme Project
    National Petroleum Construction Company (NPCC)
    UAE
    2023
  • Supply of Manpower for a period of one (01) year Extendable Manpower Supply
    Groupement Touat Gaz
    ALGERIA
    2023
  • Supply and commissioning of a computerized management system for the pressure equipment inspection activity (RBI)
    SONATRACH
    ALGERIA
    2023
  • Call Out No. 20 for CALL-OFF ORDER FOR ASSIGNMENT OF ASSET INTEGRITY ADVISOR UNDER CONSULTANCY AND PROFESSIONAL SERVICES AGREEMENT FOR ASSET INTEGRITY CONSULTANCY STUDIES & TECHNICAL SUPPORT SERVICES ON CALL-OUT BASIS
    ADNOC
    UAE
    2023
  • Corrosion Risk Assessment Study (CRAS) – EPC for New Flow Suction Tank, Access Platforms, Dead Leg Repair Works, and Sewage Treatment Plant in BUHASA – ADNOC Onshore Project No. P12513
    ROBT STONE (ME) LLC
    UAE
    2023
  • Preparation of Scope of Work for Bridging the Gaps As Identified During Third Party Asset Integrity Review Of Al Karkara Facilities
    Qatar Petroleum Development Co. Ltd. (Japan)
    Qatar
    2023
  • Elaboration d’une étude d’extension de la durée de vie des Installations du GTFT
    Groupement TFT
    ALGERIA
    2023
  • Piping Circuitization Project
    SABIC
    Saudi Arabia
    2023
  • PROVISION OF CORROSION RISK ASSESSMENT STUDY AND CORROSION CONTROL DOCUMENT FOR BOROUGE-3 PLANT
    Abu Dhabi Polymers Company Limited (BOROUGE)
    UAE
    2023
  • ARH Safety Study For JI-2050- Tinrhert EPC 2 – Lot 1: Construction of Separation and Decarbonation Units at Alrar
    Petrofac International (UAE) LLC
    UAE
    2023
  • 4600006194 – Call-Off Contract for Supply of Services of Asset Integrity and Other Associated Services CTR-010- HAZOP for WEST BUKHA PLATFORM as part of Call-Off Contract for Supply of Services of Asset Integrity and other Associated Services
    OQ S.A.O.C.
    Oman
    2023
  • Risk Based Inspection Study for Project P8405 EPC for Dalma Gas Development (DGD)
    National Petroleum Construction Company (NPCC)
    UAE
    2023
  • Legionella Monitoring/Test in Water for Bldg. B
    EMERSON AUTOMATION SOLUTIONS-Bldg. B
    UAE
    2022
  • Piping Recircuitization Project
    SABIC
    Saudi Arabia
    2022
  • Integrity Management Software Implementation Purchase Order 3200285736 – Implementacion Velosi – PER Informática Proyectos IT Llave en mano (Computing Turnkey IT Projects)
    PLUSPETROL
    PERU
    2022
  • Stainless Steel bolts Survey in Hasdrubal platform Asset Integrity Specialist Engineering Support CTR-04
    APO
    Tunisia
    2022
  • Risk Based Inspection Support Services For ADNOC Refining
    ADNOC REFINING
    UAE
    2022
  • Call Out No. 11 CALL-OFF ORDER FOR ASSIGNMENT OF ASSET INTEGRITY ADVISOR UNDER CONSULTANCY AND PROFESSIONAL SERVICES AGREEMENT FOR ASSET INTEGRITY CONSULTANCY STUDIES & TECHNICAL SUPPORT SERVICES ON CALL-OUT BASIS
    ADNOC
    UAE
    2022