Our Experience

  • AIV and FIV Studies for EPC of SAHIL Phase III Development Project – ADNOC Onshore
    Target Engineering Construction Company – Sole Proprietorship L.L.C
    UAE
    2025
  • Prestations de diagnostic de l’intégrité des installations et des équipements du Complexe RA1Z dans le cadre du Décret 21-331
    SONATRACH - Activité RPC
    ALGERIA
    2025
  • Technical Service of South East AiP5 On-Plot EPC Project (Package 2) CRAS
    China Petroleum Engineering Co. Ltd.
    UAE
    2025
  • Risk Based Inspection Consultancy for ESTIDAMA Project 2523, Package 6
    NMDC ENERGY
    UAE
    2025
  • On Call Asset Integrity Management Provision Services
    ADNOC Gas Operations And Marketing – L.L.C
    UAE
    2025
  • Corrosion Risk Assessment Study (CRAS) for EPC for SE AiP5 Project (On Plot) – ASAB/SAHIL (Package 1) – ADNOC Onshore
    ARCHIRODON CONSTRUCTION (OVERSEAS) Co. Ltd. - ABU DHABI
    UAE
    2025
  • AIV/FIV Study for LNG Transmission Pipeline Project
    CHINA PETROLEUM PIPELINE ENGINEERING COMPANY LIMITED-ABU DHABI (CPP)
    UAE
    2025
  • RAM Study for Feedstock, Utilities and Interconnecting Pipelines for Ta’ziz Industrial Park
    SNC LAVALIN INTERNATIONAL (KENT)
    UAE
    2024
  • Risk Based Inspection (RBI) Study 033714 ARAMCO LTA#96 ABUSAFA 251-1PD
    SAIPEM S.P.A.
    Saudi Arabia
    2024
  • Purchase Order (PO) for Risk Based Inspection (RBI) Study for Package # 1 of Jafurah Gas Compression Plant, Project of M/s. Saudi Aramco, Saudi Arabia.(Variation No. 1)
    L&T Hydrocarbon
    Saudi Arabia
    2024
  • Asset Integrity Management System Audit 2024
    Abu Dhabi Oil Co., Ltd. (Japan)
    UAE
    2024
  • Reliability, Availability & Maintainability (RAM) Studies for Sudair, Ar Rass-1, 2 & Al Khafa Solar PV Project
    L&T CONSTRUCTION
    Saudi Arabia
    2024
  • Risk Based Inspection Consultancy for ESTIDAMA Project 2543
    National Petroleum Construction Company - PJSC (NPCC)
    UAE
    2024
  • AIMS for EPC for M Project of ADNOC Onshore
    SK E&C
    UAE
    2024
  • Provision of Risk Based Underwater Inspection for CPOC Subsea Pipeline and Jacket Structure
    Carigali - PTTEPI Operating Company Sdn. Bhd. (CPOC)
    MalAYSIA
    2024
  • Regulatory Compliance Study of the Facilities and Equipment of the Zarzaïtine Field, divided into three (03) Lots: Lot 01: Integrity of installations and equipment (ESP, APE and APL), Corrosion and cathodic protection
    Groupement Sonatrach SINOPEC
    ALGERIA
    2024
  • RAM Study for Post Front End Engineering & Design Services of Refinery Off Gases Recovery Project
    Técnicas Reunidas
    UAE
    2024
  • RBI & RCM Study for Package – 1 of Jafurah Gas Compression Plant, Project of M/s. Saudi Aramco, Saudi Arabia
    L&T Hydrocarbon
    Saudi Arabia
    2024
  • Risk Based Inspection (RBI) Study for LTA 92 – ABSF 270/279 and MRJN 508, 2201/2209
    SAIPEM S.P.A.
    Saudi Arabia
    2024
  • AIV / FIV Analysis for Re-Select and FEED Services For Nasr 100MBD Project Phase 2 for ADNOC Offshore
    Technip Energies France - Abu Dhabi
    UAE
    2024
  • ASSET INTEGRITY SERVICES AS PART OF PROJECT: CFT/45/20/1006 – CPSF DEBOTTLENECKING AND CAPACITY UPGRADE PROJECT PHASE-I
    ILK Construction
    UAE
    2024