Our Experience

  • Uniliver Pakistan ICF want to execute SIL assessment and verification for all of its Safety Instrumented Functions at Ammonia and LPG circuits in its Ice Cream Factory, Lahore. Cause & Effect Diagrams (C&EDs) are also to be developed by Consultant.
    UNILIVER PAKISTAN LIMITED
    Pakistan
    April 2018
  • Development of AIMS Framework as Part of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
    Bashayer Pipeline Company (BAPCO)
    Sudan
    August 2020
  • Provision of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
    Bahrain Petroleum Company - BAPCO
    Sudan
    Present
  • FFS & Life Extension Study for Bunduq Pipelines
    Bunduq
    UAE
  • Consultancy Services for Remaining Life Assessment & Fitness for Service Study
    Qatar Fertilizer Company (QAFCO)
    Qatar
    September 2024
  • Pilot RBI Study for Wellhead Pressure equipment for Salamander Energy
    Salamander Energy
    Thailand
    March 2012
  • RBI @ Daleel – Integrity Study of Bushra Line
    DALEEL PETROLEUM L.L.C
    oman
    January 2015
  • RBI for Khursaniyah, Abu Ali Plant (AAPD and KPD)
    Saudi Aramco
    Saudi Arabia
  • Risk Based Inspection Study Clean Fuels Project Ras Tanura
    TÉCNICAS REUNIDAS
    Spain
  • Song Doc Project (Oil & Gas Project )- Block 46/02- It is about 170km offshore, Vietnam, operated by Truong Son Joint Operating Company (TSJOC). The Song Doc field facilities comprise an FPSO and wellhead platform.
    Truong Son JOC
    Vietnam
    December 2008
  • Written Scheme of Examination – Inspections for Steam and Feed Water Systems for Qatar Aluminium Ltd. (QATALUM)
    Qatar Aluminium Ltd. (QATALUM)
    Qatar
    September 2014
  • Development of Asset Integrity Key Performance Indicators – Phase 2
    ZADCO
    UAE
  • Visual Inspection, thickness measurement and condition evaluation for Windgirders, handrails and stiffening rings for 60-TK-001A/B
    DUSUP
    UAE
  • Risk Based Inspection Study for following assets
    Dolphin Energy Limited, UAE
    United Arab Emirates UAE
    March 2015
  • Risk Based Inspection Assessment Integrity Services for LAM – 13, LAM – 63 & Block – 4 Offshore Platforms of DOTL
    Dragon Oil Turkmenistan Limited (DOTL)
    United Arab Emirates UAE
    December 2019
  • RBI at Khurais (KhPD) Static Equipment
    Saudi Aramco
    Saudi Arabia
    December 2014
  • QP DUKHAN Develop Inspction Plans for In-Plant Piping Within DUKHAN
    Qatar Petroleum
    Qatar
  • Risk Based Inspection Program Development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and Hull
    PETRONAS
    Malaysia
  • Structural Verification & Certification of Lam C Platform with 2 additional slots for Dragon Oil Turkmenistan Ltd.
    Dragon Oil Turkmenistan Limited (DOTL)
    Turkmenistan
    June 2021
  • SIL Verification Study for Ras Tanura Refinery Sour Water Stripper (SWS) Project
    Tecnicas Reunidas
    United Arab Emirates UAE
    In Progress
  • Borouge Inspection & Corrosion Management System Audit
    BOROUGE
    United Arab Emirates UAE
    February 2021