Our Experience

  • Integrity Management Support Services for EQUION Energy Limited.
    EQUION Energy Limited.
    Colombia
    2014
  • Order Number: 3610078194 MOB OF RAM ENGINEER & RAM CONS.(BAYAN) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014
  • Provision of Third Party Approval (Detailed design stage) of SNG/NG service pipeline & Installation Pipe work
    Qenergy
    Australia
    2014
  • Development, Implementation and Support of Risk Based Inspection Programs for Field Production Facilities of the Qurana -2 Field in Iraq
    Luk Oil Middle East Ltd.
    Iraq
    2014
  • Development and Implementation of an integrated maintenance and reliability system (MRS) for Murphy’s operations
    Murphy
    Malaysia
    2014
  • Conduct an RBI Services for Yanbu Refinery for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2014
  • KPOC CTR 001A Pipeline RBI Study-crude
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • “Order Number: 3620025175 MOB of RAM Engineer & RAM CONS. FR RAM (MCOT) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations”
    Petronas Carigali
    Malaysia
    2014
  • Provision of Third Party Design Approval for detailed stage NG/SNG System Project: “PF CHANGE Restaurant in Yas Mall
    Al Fanar
    Saudi Arabia
    2014
  • Written Scheme of Examination – Inspections for Steam and Feed Water Systems for Qatar Aluminium Ltd. (QATALUM)
    Qatar Aluminium Ltd. (QATALUM)
    Qatar
    2014
  • Project No: ABE-3666 Design Appraisal of Piping works and Static Equipment’s.
    Al Banna Engineering LLC
    Dubai, UAE
    2014
  • Asset Register Verification & HSECES Implementation for GASCO Pipeline Network Division Phase-II
    GASCO Abu Dhabi Gas Industries Ltd
    United Arab Emirates UAE
    2014
  • PWA/GTC/004/11-12 – Consultancy Services For Survey Services For Pavement Condition And Right Of Way Asset Inventory Data Collection Including Provision Of Necessary Software Solutions, Training And Post Implementation Support Services EBSD /10-11/N/003/G
    ASHGHAL
    Qatar
    2014
  • KPOC CTR 001B Pipeline RBI Study-Gas
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Order Number: 3620072512 PO CTRs OFFSHORE VISIT – TE, D18,BY,BK as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014
  • Reliability Centered Maintenance (RCM) of Maintenance Optimization Program (MOP) as part of Continuous Improvement Plan (CIP) for Asset Integrity Management (AIM) System as FPSO Bunga Kertas
    MISC Offshore Floating Terminals (L) Limited
    Malaysia
    2014
  • Third Party Approval of detailed design package and of NG Installation Pipe work.
    Al Fanar
    Saudi Arabia
    2014
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
    Binh SON Refining & Petrochemical CO. LTD (BSR
    Vietnam
    2014
  • Project No: LUS-O&M0921 Design Calculation for Cassette Arrangement (Top Frame).
    Degermont SA Qatar
    Qatar
    2014
  • Tank Terminal (Including Integrity & HSE (Health Safety and Environment) Studies)
    Oil and Gas Regularity Authority (OGRA)
    Pakistan
    2014
  • Validation of Structural Suitability of Ground Floor Slab in GUP Substation to Accommodate Additional Equipment Racks
    Abu Dhabi Oil Refining Company (TAKREER)
    Abu Dhabi, UAE
    2014