Our Experience

  • TDR-012/22/2012 -Structural Assessment Of Steel Making Shop And Rolling Mill
    QATAR STEEL CO.
    Qatar
    2012
  • Structural Integrity Assessment and Life Extension Study for WHP-C Wellhead Platform for BUNDUQ Company Limited.
    Bunduq Company Ltd
    United Arab Emirates UAE
    2012
  • Provision of Risk-Based Inspection (RBI) Assessment for Static Mechanical Equipment and Piping for Production Operation for Newfield Peninsula Malaysia Inc.
    Newfield Peninsula
    Malaysia
    2012
  • BUNDUQ – Pipeline Integrity Assessment and Life Extension for 2nos Pipeline
    BUNDUQ Company Limited
    United Arab Emirates UAE
    2012
  • Small Bore Piping Integrity Program
    Egyptian ELNG
    Egypt
    2012
  • Pilot Risk Based Inspection (RBI) Study for Wellhead Structure for Salamander Energy (Bualuang) Limited.
    Salamander Energy
    Thiland
    2012
  • Baseline Risk Based Inspection (RBI) Study for Topsides Equipments
    Salamander Energy
    Thailand
    2012
  • FFS and Life Extension Services for Pressure Vessels
    BUNDUQ Company Limited
    United Arab Emirates UAE
    2012
  • Risk-Based Inspection (RBI) Implementation at DHBP & DHTF for Ras Tanura Refinery Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2012
  • Pilot Risk based Inspection (RBI) Study for Wellhead Structurefor Salmander Energy
    Salmander Energy
    Thailand
    2012
  • Risk Based Inspection (RBI) based Strategy for the management of Dead Leg of Unit 1U-14, 15, 16 and 17 for Egyptian LNG.
    Egyptian LNG.
    Egypt
    2012
  • Structural Integrity & Life Extension Study for WHP-B
    BUNDUQ Company Limited
    United Arab Emirates UAE
    2012
  • Provision of Risk-Based Inspection (RBI) Assessment for Static Mechanical Equipment and Piping for Production Operation for Newfield Peninsula Malaysia Inc. (Upstream Oil & Gas)
    Newfield
    Malaysia
    2012
  • Risk-Based Inspection (RBI) Assessment of DHT Complex – Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2012
  • BUNDUQ – Structural Integrity & Life Extension Study for WHP-C
    Bunduq Company Ltd
    United Arab Emirates UAE
    2012
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO Habshan. (NGL Plant)
    GASCO
    United Arab Emirates UAE
    2011
  • RBI / RCM based Reliability and Maintenance effectiveness Implementation by using Meridium RCMO software for Al-Khafji Joint Operations (KJO)
    Al-Khafji Joint Operations (KJO)
    Saudi Arabia
    2011
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO (ASAB 0 & ASAB 1 , HABSHAN, RUWAIS, BU HASA)
    GASCO
    United Arab Emirates UAE
    2011
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO Ruwais. (LPG Plant)
    GASCO
    United Arab Emirates UAE
    2011
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO BAB. (Gas Processing Plant)
    GASCO
    United Arab Emirates UAE
    2011
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO BuHasa. (Gas Processing Plant)
    GASCO
    United Arab Emirates UAE
    2011