Our Experience

  • FFS and Life Extension Services for Pressure Vessels
    BUNDUQ Company Limited
    United Arab Emirates UAE
    2012
  • Risk-Based Inspection (RBI) Implementation at DHBP & DHTF for Ras Tanura Refinery Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2012
  • Pilot Risk based Inspection (RBI) Study for Wellhead Structurefor Salmander Energy
    Salmander Energy
    Thailand
    2012
  • Risk Based Inspection (RBI) based Strategy for the management of Dead Leg of Unit 1U-14, 15, 16 and 17 for Egyptian LNG.
    Egyptian LNG.
    Egypt
    2012
  • Structural Integrity & Life Extension Study for WHP-B
    BUNDUQ Company Limited
    United Arab Emirates UAE
    2012
  • Provision of Risk-Based Inspection (RBI) Assessment for Static Mechanical Equipment and Piping for Production Operation for Newfield Peninsula Malaysia Inc. (Upstream Oil & Gas)
    Newfield
    Malaysia
    2012
  • Risk-Based Inspection (RBI) Assessment of DHT Complex – Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2012
  • BUNDUQ – Structural Integrity & Life Extension Study for WHP-C
    Bunduq Company Ltd
    United Arab Emirates UAE
    2012
  • Establishment of Risk Based Inspection (RBI) Programs in Al-Khafji Joint Operations-KJO (for all Stationary Equipment & Piping System)
    KJO
    Saudi Arabia
    2012
  • Develop Risk Based Inspection (RBI) based inspection plans for in – plant piping within DUKHAN for Qatar Petroleum
    Qatar Petroleum
    Qatar
    2012
  • Pilot RBI Study for Wellhead Structure
    Salamander Energy
    Thailand
    2012
  • Provision of RBI Assessment for Static Mechanical Equipment
    Newfield
    Malaysia
    2012
  • Structural Integrity & Life Extension Study for WHP-E
    BUNDUQ Company Limited
    United Arab Emirates UAE
    2012
  • Risk Based Inspection (RBI) Static Equipment’s & Piping @ QSWP for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2012
  • Pilot RBI Study for Wellhead to Process Platform /onshore
    Salamander Energy
    Thailand
    2012
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO Habshan. (NGL Plant)
    GASCO
    United Arab Emirates UAE
    2011
  • RBI / RCM based Reliability and Maintenance effectiveness Implementation by using Meridium RCMO software for Al-Khafji Joint Operations (KJO)
    Al-Khafji Joint Operations (KJO)
    Saudi Arabia
    2011
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO (ASAB 0 & ASAB 1 , HABSHAN, RUWAIS, BU HASA)
    GASCO
    United Arab Emirates UAE
    2011
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO Ruwais. (LPG Plant)
    GASCO
    United Arab Emirates UAE
    2011
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO BAB. (Gas Processing Plant)
    GASCO
    United Arab Emirates UAE
    2011
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO BuHasa. (Gas Processing Plant)
    GASCO
    United Arab Emirates UAE
    2011