Our Experience

  • KPOC CTR 001A Pipeline RBI Study-crude
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Third Party Technical Integrity Verification Services
    SHELL IRAQ
    IRAN
    2014
  • KPOC CTR 001B Pipeline RBI Study-Gas
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Additional Conduct Risk Based Inspection (RBI) @ UGP for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2014
  • KPOC CTR 002A Structure RBI Study-Sub Structure
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Conduct an RBI Services for Yanbu Refinery for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2014
  • Reliability Centered Maintenance (RCM) of Maintenance Optimization Program (MOP) as part of Continuous Improvement Plan (CIP) for Asset Integrity Management (AIM) System as FPSO Bunga Kertas
    MISC Offshore Floating Terminals (L) Limited
    Malaysia
    2014
  • Condition Assessment for Super Structure of LPG Tanks at Gas Operations, MESAIEED
    Salamander Energy
    Thailand
    2014
  • KPOC CTR 002B Structure RBI Study-Topside Structure
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Written Scheme of Examination – Inspections for Steam and Feed Water Systems for Qatar Aluminium Ltd. (QATALUM)
    Qatar Aluminium Ltd. (QATALUM)
    Qatar
    2014
  • CTR-012 – Preparation of Inspection Standard Operating Procedures (SOPs)
    Kebabangan Petroleum Operating Company Sdn Bhd (KPOC)
    Malaysia
    2013
  • Baseline Risk Based Inspection (RBI) study for offshore pipeline from wellhead to process platform / onshore
    Salamander Energy
    Thailand
    2013
  • Provision of Asset & Operation Integrity Services
    Kebabangan Petroleum Operating Company Sdn. Bhd - KPOC
    Malaysia
    2013
  • QP DUKHAN Develop Inspction Plans for In-Plant Piping Within DUKHAN
    Qatar Petroleum- Dukhan
    Qatar
    2013
  • Conduct RBI for GPD Gas Wells and Manifolds for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2013
  • Risk Based Inspection Study at Uthmaniyah Gas Plant for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2013
  • Provision of Asset & Operation Integrity Services
    Kebabangan Petroleum Operating Company Sdn Bhd (KPOC)
    Malaysia
    2013
  • Structural Integrity Assessment and Life Extension Study for WHP-E Wellhead Platform for BUNDUQ Company Limited.
    Bunduq Company Ltd
    United Arab Emirates UAE
    2013
  • RBI study for Pipelines for GPD Gas Wells and Manifolds for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2013
  • Development of RBI Based Asset Integrity Management Strategy & System for Topside Equipments in RAK GAS
    RAK GAS
    United Arab Emirates UAE
    2013
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
    Binh Son Refining and Petrochemical Company Limited (BSR)
    Vietnam
    2013