Our Experience

  • Reliability Centered Maintenance (RCM) of Maintenance Optimization Program (MOP) as part of Continuous Improvement Plan (CIP) for Asset Integrity Management (AIM) System as FPSO Bunga Kertas
    MISC Offshore Floating Terminals (L) Limited
    Malaysia
    2014
  • Condition Assessment for Super Structure of LPG Tanks at Gas Operations, MESAIEED
    Salamander Energy
    Thailand
    2014
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
    Binh SON Refining & Petrochemical CO. LTD (BSR
    Vietnam
    2014
  • Written Scheme of Examination – Inspections for Steam and Feed Water Systems for Qatar Aluminium Ltd. (QATALUM)
    Qatar Aluminium Ltd. (QATALUM)
    Qatar
    2014
  • KPOC CTR 002A Structure RBI Study-Sub Structure
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Development & Implementation of Integrated Maintenance & Reliability System
    MURPHY
    Malaysia
    2014
  • KPOC CTR 002B Structure RBI Study-Topside Structure
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • PWA/GTC/004/11-12 – Consultancy Services For Survey Services For Pavement Condition And Right Of Way Asset Inventory Data Collection Including Provision Of Necessary Software Solutions, Training And Post Implementation Support Services EBSD /10-11/N/003/G
    ASHGHAL
    Qatar
    2014
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD
    Binh SON Refining & Petrochemical CO. LTD (BSR)
    Vietnam
    2014
  • Risk Based Inspection (RBI) at North Jeddah Bulk Plant for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2014
  • Development, Implementation and Support of Pressurized Equipment Management System (PEMS) for Equipment and Piping System
    Bunduq Company Ltd
    United Arab Emirates UAE
    2014
  • Conduct Risk Based Inspection (RBI) at JNGLF for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2014
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
    Binh Son Refining and Petrochemical Company Limited (BSR)
    Vietnam
    2013
  • Risk Based Inspection (RBI) Study at AAPD & KRSN Plants.
    Saudi Aramco
    Saudi Arabia
    2013
  • Provision of Asset & Operation Integrity Services
    Kebabangan Petroleum Operating Company Sdn Bhd (KPOC)
    Malaysia
    2013
  • Development of RBI Based Asset Integrity Management Strategy & System for Offshore / Onshore Pipelines in RAK GAS
    Rak Gas
    United Arab Emirates UAE
    2013
  • Structural Integrity Assessment and Life Extension Study for WHP-E Wellhead Platform for BUNDUQ Company Limited.
    Bunduq Company Ltd
    United Arab Emirates UAE
    2013
  • Conduct Risk Based Inspection (RBI) Assessment at Shedgum Gas Plant (ShGPD – FGS/PS/FS)
    Saudi Aramco
    Saudi Arabia
    2013
  • Computerized Integrity Engineering Services
    Talisman Energy Limited
    Malaysia
    2013
  • Baseline Risk Based Inspection (RBI) study for offshore pipeline from wellhead to process platform / onshore
    Salamander Energy
    Thailand
    2013
  • Preparation of Facility Integrity Management (FIMS) Inspection Procedures in line ADNOC Guidelines.
    Bunduq Company Ltd
    United Arab Emirates UAE
    2013