Our Experience

  • Development of risk-based inspection (RBI) methodology for maintenance & testing of Pressure Safety Valves (PSV)
    BUNDUQ COMPANY LIMITED
    UAE
    2024
  • Risk Based Inspection (RBI) Study 033714 ARAMCO LTA#96 ABUSAFA 251-1PD
    SAIPEM S.P.A.
    Saudi Arabia
    2024
  • Purchase Order (PO) for Risk Based Inspection (RBI) Study for Package # 1 of Jafurah Gas Compression Plant, Project of M/s. Saudi Aramco, Saudi Arabia.(Variation No. 1)
    L&T Hydrocarbon
    Saudi Arabia
    2024
  • Risk Based Inspection Consultancy for ESTIDAMA Project 2543
    National Petroleum Construction Company - PJSC (NPCC)
    UAE
    2024
  • Provision of Risk Based Underwater Inspection for CPOC Subsea Pipeline and Jacket Structure
    Carigali - PTTEPI Operating Company Sdn. Bhd. (CPOC)
    MalAYSIA
    2024
  • Risk Based Inspection (RBI) Study for LTA 92 – ABSF 270/279 and MRJN 508, 2201/2209
    SAIPEM S.P.A.
    Saudi Arabia
    2024
  • AIV / FIV Analysis for Re-Select and FEED Services For Nasr 100MBD Project Phase 2 for ADNOC Offshore
    Technip Energies France - Abu Dhabi
    UAE
    2024
  • DATA ACQUISITION, CIRCUITIZATION, RBI ANALYSIS & INSPECTION PLANNING FOR QATARENERGY REFINERY MESAIEED
    QatarEnergy
    Qatar
    2024
  • Provision of Service for Risk Based Inspection (RBI) Study for 20″ MOL from UMM LULU to ZIRKU Island Project No. 2683
    National Petroleum Construction Company - PJSC (NPCC)
    UAE
    2024
  • AGO Risk-Based Inspection Evergreening Assessment – PR # 3001112421
    Saudi Aramco
    Saudi Arabia
    2024
  • Material Selection Study for Engineering Services for ADNOC ONSHORE TIE-INS
    Bilfinger Tebodin Middle East
    UAE
    2023
  • Risk Based Inspection Program Development Services
    Nawah Energy Company
    UAE
    2023
  • Risk Based Inspection (RBI) Study for P-2369 – LZ (Lower Zakum), LTDP – 1 (Long Term Development Plan) for NMGL (New Main Gas Line) EPC Project
    National Petroleum Construction Company (NPCC)
    UAE
    2023
  • Risk Based Inspection Study (RBI) – for ADNOC Project 2136 – Umm Al Dalkh Early Production Scheme Project
    National Petroleum Construction Company (NPCC)
    UAE
    2023
  • Piping Circuitization Project
    SABIC
    Saudi Arabia
    2023
  • Risk Based Inspection Study for Project P8405 EPC for Dalma Gas Development (DGD)
    National Petroleum Construction Company (NPCC)
    UAE
    2023
  • Risk Based Inspection (RBI) Study for H02789 Saudi Aramco LTA2 68 2WBI & 1OIL PDM – MRJN
    SNAMPROGETTI SAUDI ARABIA CO.LTD. (SAIPEM
    Saudi Arabia
    2023
  • RBI (Risk Based Inspection) Study for Jafurah GPF Project
    Samsung Engineering Co., Ltd.
    Saudi Arabia
    2023
  • Thuê dịch vụ hỗ trợ kỹ thuật hệ thống kiểm tra thiết bị RBI (Vail-Plant) năm 2022
    Binh Son Refinery
    Veitnam
    2022
  • RBI IMPLEMENTATION UTILIZING APMS MECHANICAL INTEGRITY MODULE IN QP VARIOUS LOCATIONS
    QATAR PETROLEUM
    Qatar
    2022
  • 9900017423-CALL-OFF CONTRACT FOR SUPPLY OF SERVICES OF ASSET INTEGRITY AND OTHER ASSOCIATED SERVICES CTR-006- PERFORMING RBI STUDY ON VAIL PLANT SOFTWARE FOR RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE-1) CTR-6
    OQ S.A.O.C.
    Oman
    2022