Velosi Secures Major Compliance Assessment Contract with SONATRACH for GPDF Installations
Velosi is pleased to announce the award of a new contract with SONATRACH/TRC/Direction GPDF for carrying out a comprehensive technical diagnosis and developing a compliance program for GPDF installations in terms of:
Lot 1 โ Industrial Risk Prevention
Lot 2 โ Environmental Protection within the framework of sustainable development.
๐๐๐จ๐ฉ๐ ๐จ๐ ๐๐จ๐ซ๐ค
The detailed diagnosis of the compliance of installations and equipment will be carried out in accordance with regulatory requirements, notably those of Executive Decree No. 21-331 of 25/08/2021, which sets the conditions for bringing installations and equipment related to hydrocarbon activities into compliance, as well as SONATRACH standards and reference documents, and international standards and best practices.
The diagnosis will include two (2) parts:
1. A detailed diagnosis identifying gaps and non-conformities with respect to applicable regulations, standards, and norms.
2. An action plan (corrective and preventive) for compliance, prioritization according to the criticality matrix, and a budget estimate for potential actions to be undertaken.
๐๐๐ฅ๐ข๐ฏ๐๐ซ๐๐๐ฅ๐๐ฌ
โข Training in technical diagnostic methodology for 20 people
โข ATEX training for 8 people
โข QRA training for 15 people
โข FERA training for 15 people
โข HAZOP training for 8 people
โข HAZID training for 15 people
โข SIL training for 15 people
โข Preparation and submission of the methodology report
โข Preparation and submission of the site survey report
โข Preparation and submission of the ATEX study report (HAC & adequacy)
โข Preparation and submission of the HAZOP report
โข Preparation and submission of the HAZID study report
โข Preparation and submission of the SIL verification study report
โข Preparation and submission of the FERA report
โข Preparation and submission of the Bowtie study report
โข Preparation and submission of the noise study report
โข Review of company studies (EDD / EIE / SGS / PGE / PII) and identification of gaps/findings
โข Intermediate diagnostic reports for the compression station (SC3) Intermediate diagnostic reports for the Terminal Arrival (TA) site
โข
โข Intermediate diagnostic reports for pipeline, isolation, and shut-off stations (PS / PC)
โข Preliminary diagnostic report
โข Final diagnostic report
โข Action plans for the compliance report
โข A software application that displays
โข the various regulatory and standard compliance requirements
โข The compliance rate (percentage) for each requirement and the overall compliance rate;
โข A chart illustrating regulatory compliance by aspect and by area
This contract reinforces Velosi’s commitment to supporting clients in achieving full regulatory compliance and operational excellence in industrial safety and environmental management.
Enquire Now: https://velosiaims.com/contact-us/


