Our Experience

  • KPOC CTR 002B Structure RBI Study-Topside Structure
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Development, Implementation and Support of Risk Based Inspection Programs for Field Production Facilities of the Qurana -2 Field in Iraq
    Luk Oil Middle East Ltd.
    Iraq
    2014
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
    Binh SON Refining & Petrochemical CO. LTD (BSR
    Vietnam
    2014
  • Risk Based Inspection (RBI) at North Jeddah Bulk Plant for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2014
  • Conduct Risk Based Inspection (RBI) at JNGLF for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2014
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD
    Binh SON Refining & Petrochemical CO. LTD (BSR)
    Vietnam
    2014
  • Development of RBI Based Asset Integrity Management Strategy & System for Offshore / Onshore Pipelines in RAK GAS
    Rak Gas
    United Arab Emirates UAE
    2013
  • Conduct Risk Based Inspection (RBI) Assessment at Shedgum Gas Plant (ShGPD – FGS/PS/FS)
    Saudi Aramco
    Saudi Arabia
    2013
  • Baseline Risk Based Inspection (RBI) study for offshore pipeline from wellhead to process platform / onshore
    Salamander Energy
    Thailand
    2013
  • RBI study for Pipelines for GPD Gas Wells and Manifolds for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2013
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
    Binh Son Refining and Petrochemical Company Limited (BSR)
    Vietnam
    2013
  • Conduct RBI for GPD Gas Wells and Manifolds for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2013
  • Risk Based Inspection Study at Uthmaniyah Gas Plant for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2013
  • QP DUKHAN Develop Inspction Plans for In-Plant Piping Within DUKHAN
    Qatar Petroleum- Dukhan
    Qatar
    2013
  • Computerized Integrity Engineering Services
    Talisman Energy Limited
    Malaysia
    2013
  • Risk Based Inspection (RBI) Study at AAPD & KRSN Plants.
    Saudi Aramco
    Saudi Arabia
    2013
  • Development of RBI Based Asset Integrity Management Strategy & System for Topside Equipments in RAK GAS
    RAK GAS
    United Arab Emirates UAE
    2013
  • Pilot Risk Based Inspection (RBI) Study for Offshore Pipeline from Wellhead to Process Platform for Salamander Energy (Bualuang) Limited.
    Salamander Energy
    Thiland
    2012
  • Pilot Risk based Inspection (RBI) Study for Wellhead Structurefor Salmander Energy
    Salmander Energy
    Thailand
    2012
  • Pilot Risk Based Inspection (RBI) Study for Wellhead Structure for Salamander Energy (Bualuang) Limited.
    Salamander Energy
    Thiland
    2012
  • Risk-Based Inspection (RBI) Implementation at DHBP & DHTF for Ras Tanura Refinery Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2012