Our Experience

  • Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
    PETRONAS Floating LNG 1 (L) Ltd.
    Malaysia
    2015
  • Development, Implementation and Support of Pressure Safety Valves Inspection Management System (PSV IMS) for PSV’s Operated at Production Facilities of the West Qurna-2 Field for Lukoil
    Luk Oil Middle East Ltd.
    Iraq
    2015
  • Development, Implementation and Support of Pressurized Equipment Management System (PEMS) for Equipment and Piping System
    Bunduq Company Ltd
    United Arab Emirates UAE
    2014
  • Implementation of VAIL-Plant® Software and Provision of RBI Services for BW Offshore Singapore Ltd.
    BW Offshore Singapore Ltd
    Singapore
    2014
  • Development and Implementation of an integrated maintenance and reliability system (MRS) for Murphy’s operations
    Murphy
    Malaysia
    2014
  • Facility Integrity Management System (FIMS) Implementation for Platform WHP-A ,WHP- B & EB-06 Wellhead Platforms Structure, Pipelines
    Bunduq Company Ltd
    United Arab Emirates UAE
    2013
  • Implementation of VAIL-Plant® Software and Provision of RBI Services for BW Offshore Singapore Ltd.
    BW Offshore
    Singapore
    2013
  • Facility Integrity Management System (FIMS) Implementation for WHP-B & WHP-D Wellhead Platform Structure, Pipeline & Topsides for BUNDUQ Company Limited.
    Bunduq Company Ltd
    United Arab Emirates UAE
    2013
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
    Binh Son Refining and Petrochemical Company Limited (BSR)
    Vietnam
    2013
  • Facility Integrity Management System Implementation for Wellhead Platform WHP-A, WHP-C and EB-06 For BUNDUQ Company Limited.
    Bunduq Company Ltd
    United Arab Emirates UAE
    2012
  • Inspection Management System
    Abu Dhabi National Oil Company (ADNOC)
    United Arab Emirates UAE
    2012
  • Provision of Risk-Based Inspection (RBI) Assessment for Static Mechanical Equipment and Piping for Production Operation for Newfield Peninsula Malaysia Inc.
    Newfield Peninsula
    Malaysia
    2012
  • Establisment of Risk Based Inspection Program
    Al Khafji Joint Operation
    Saudia Arabia
    2011
  • Reliability Centered Maintenance (RCM) Study Supply ENI, Pakistan
    ENI PAKISTAN LIMITED
    Pakistan
    2010
  • Review and Assessment of performance standards for BPP-Badin facilities (especially for protective system)
    BP Pakistan
    Pakistan
    2008
  • Review and Assessment of performance standards for BPP-Badin facilities (especially for protective system)
    BP Pakistan
    Pakistan
    2008
  • MAINTENANCE AND SUPPORT SERVICES OF VAIL (VELOSI ASSET INTEGRITY LIMITED) PLANT SOFTWARE FOR THREE YEARS
    Pakistan Petroleum Limited (PPL)
    Pakistan
    In Progress
  • VAIL Plant Software License Agreement Extension for EIRMS & PSVMS Modules for 3 Years
    Dragon Oil Turkmenistan Limited (DOTL)
    UAE & Turkmenistan
    In Progress
  • SOW for EIRMS Implementation Services for LAM-C, LAM-22, LAM-13 and LAM-63 Offshore Platforms
    Dragon Oil Turkmenistan Limited (DOTL)
    UAE & Turkmenistan
    In Progress
  • SOW for RBI Assessment and Implementation for VAIL-Plant® PIMS, SIMS, & PEMS for LAM-10, LAM-75, ZHD-21, and ZHD-60
    Dragon Oil Turkmenistan Limited (DOTL)
    UAE & Turkmenistan
    In Progress
  • Provision of Consulting Services for Preventive Maintenance Optimization (PMO) upgrade.
    Daleel Petroleum LLC
    Oman
    In Progress