Our Experience

  • KPOC CTR 002B Structure RBI Study-Topside Structure
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Risk Based Inspection (RBI) Study for PS-1 & PS-3 for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2014
  • Third Party Technical Integrity Verification Services
    SHELL IRAQ
    IRAN
    2014
  • KPOC CTR 004 RBI Study for Topside Equipments, Piping System and Pressure Relief Devices
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Development, Implementation and Support of Risk Based Inspection Programs for Field Production Facilities of the Qurana -2 Field in Iraq
    Luk Oil Middle East Ltd.
    Iraq
    2014
  • Reliability Centered Maintenance (RCM) of Maintenance Optimization Program (MOP) as part of Continuous Improvement Plan (CIP) for Asset Integrity Management (AIM) System as FPSO Bunga Kertas
    MISC Offshore Floating Terminals (L) Limited
    Malaysia
    2014
  • Condition Assessment for Super Structure of LPG Tanks at Gas Operations, MESAIEED
    Salamander Energy
    Thailand
    2014
  • CTR-012 – Preparation of Inspection Standard Operating Procedures (SOPs)
    Kebabangan Petroleum Operating Company Sdn Bhd (KPOC)
    Malaysia
    2013
  • QP DUKHAN Develop Inspction Plans for In-Plant Piping Within DUKHAN
    Qatar Petroleum- Dukhan
    Qatar
    2013
  • Conduct RBI for GPD Gas Wells and Manifolds for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2013
  • Risk Based Inspection Study at Uthmaniyah Gas Plant for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2013
  • RBI study for Pipelines for GPD Gas Wells and Manifolds for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2013
  • Provision of Asset & Operation Integrity Services
    Kebabangan Petroleum Operating Company Sdn. Bhd - KPOC
    Malaysia
    2013
  • Development of RBI Based Asset Integrity Management Strategy & System for Topside Equipments in RAK GAS
    RAK GAS
    United Arab Emirates UAE
    2013
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
    Binh Son Refining and Petrochemical Company Limited (BSR)
    Vietnam
    2013
  • Risk Based Inspection (RBI) Study at AAPD & KRSN Plants.
    Saudi Aramco
    Saudi Arabia
    2013
  • Provision of Asset & Operation Integrity Services
    Kebabangan Petroleum Operating Company Sdn Bhd (KPOC)
    Malaysia
    2013
  • Development of RBI Based Asset Integrity Management Strategy & System for Offshore / Onshore Pipelines in RAK GAS
    Rak Gas
    United Arab Emirates UAE
    2013
  • Structural Integrity Assessment and Life Extension Study for WHP-E Wellhead Platform for BUNDUQ Company Limited.
    Bunduq Company Ltd
    United Arab Emirates UAE
    2013
  • Conduct Risk Based Inspection (RBI) Assessment at Shedgum Gas Plant (ShGPD – FGS/PS/FS)
    Saudi Aramco
    Saudi Arabia
    2013
  • Computerized Integrity Engineering Services
    Talisman Energy Limited
    Malaysia
    2013