Our Experience

  • Reliability Centered Maintenance (RCM) Study for Unit 13 in Hydroskimmer Plant at Ruwais Refinery
    TAKREER
    United Arab Emirates UAE
    2015
  • Third Party Technical Integrity Verification Services
    SHELL IRAQ
    IRAN
    2014
  • KPOC CTR 004 RBI Study for Topside Equipments, Piping System and Pressure Relief Devices
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Development, Implementation and Support of Risk Based Inspection Programs for Field Production Facilities of the Qurana -2 Field in Iraq
    Luk Oil Middle East Ltd.
    Iraq
    2014
  • Reliability Centered Maintenance (RCM) of Maintenance Optimization Program (MOP) as part of Continuous Improvement Plan (CIP) for Asset Integrity Management (AIM) System as FPSO Bunga Kertas
    MISC Offshore Floating Terminals (L) Limited
    Malaysia
    2014
  • Condition Assessment for Super Structure of LPG Tanks at Gas Operations, MESAIEED
    Salamander Energy
    Thailand
    2014
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
    Binh SON Refining & Petrochemical CO. LTD (BSR
    Vietnam
    2014
  • Written Scheme of Examination – Inspections for Steam and Feed Water Systems for Qatar Aluminium Ltd. (QATALUM)
    Qatar Aluminium Ltd. (QATALUM)
    Qatar
    2014
  • KPOC CTR 002A Structure RBI Study-Sub Structure
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Development & Implementation of Integrated Maintenance & Reliability System
    MURPHY
    Malaysia
    2014
  • KPOC CTR 002B Structure RBI Study-Topside Structure
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • PWA/GTC/004/11-12 – Consultancy Services For Survey Services For Pavement Condition And Right Of Way Asset Inventory Data Collection Including Provision Of Necessary Software Solutions, Training And Post Implementation Support Services EBSD /10-11/N/003/G
    ASHGHAL
    Qatar
    2014
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD
    Binh SON Refining & Petrochemical CO. LTD (BSR)
    Vietnam
    2014
  • Risk Based Inspection (RBI) at North Jeddah Bulk Plant for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2014
  • Development, Implementation and Support of Pressurized Equipment Management System (PEMS) for Equipment and Piping System
    Bunduq Company Ltd
    United Arab Emirates UAE
    2014
  • Conduct Risk Based Inspection (RBI) at JNGLF for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2014
  • Written Scheme of Examination – Inspections for Steam and Feed Water Systems for Qatar Aluminium Ltd. (QATALUM)
    Qatar Aluminium Ltd. (QATALUM)
    Qatar
    2014
  • KPOC CTR 001A Pipeline RBI Study-crude
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Pipeline Integrity Assessment and Life Extension Study for 6 Nos. Pipelines
    Bunduq Company Ltd
    United Arab Emirates UAE
    2014
  • Work Pack of Topside for Bravo Platform plus Processing and Power Module
    Salamander Energy
    Thailand
    2014
  • KPOC CTR 001B Pipeline RBI Study-Gas
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014