Our Experience

  • Updating of ADCO Corporate Inspection Management System Procedure Document
    Australian Building Construction Company - ADCO
    United Arab Emirates UAE
    2016
  • Consltancy Services For Condition Assessment Of Reinforces Cement Concrete Clarifier And Water Basin Tanks, Dr, Qatar Steel.
    QATAR STEEL
    Qatar
    2016
  • Risk Based Inspection for Jazan Project for SAIPEM (Equipment & Piping)
    SAIPEM
    Italy
    2016
  • LTC/ ENG/2030/12 -CALL-OFF Contract For The Supply Of Sub-Sea Representative To Oversee The Underwater Inspection Surveys Of All Platforms And Do Condition Monitoring Survey For Offshore Pipelines, Cables And Associated Sub Connection Facilities
    QATARGAS OPERATING COMPANY LIMITED
    Qatar
    2016
  • Risk Based Inspection (RBI) at Jazan Refinery & Terminal Project for Hyundai Arabia Limited
    Hyundai Arabia Limited
    Saudi Arabia
    2016
  • Consltancy Services For Condition Assessment Of Reinforces Cement Concrete Clarifier And Water Basin Tanks, Dr, Qatar Steel.
    QATAR STEEL
    Qatar
    2016
  • Conduct Risk Based Inspection at Manifa Producing Facilities (MPD) for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2016
  • Order No. 3620287133 PL202 Fitness for Services (FFS ) + Life extension assessment Study (LEA) Pipeline Intelligent Pigging as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Consultancy Services for carrying Fitness for Services and Remaining Life Assessment of Amonia 1 & 2 Equipment and Structure
    Qatar Fertilizer Company (QAFCO)
    Qatar
    2016
  • RBI Equipment Assessment for ORYX GTL
    ORYX GTL
    Qatar
    2016
  • Risk Based Inspection (RBI) at Jeddah Refinery for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2015
  • Structural Integrity Assessment & Life Extension Study for EB-37
    Bunduq Company Ltd
    United Arab Emirates UAE
    2015
  • Risk Based Inspection Study (RBI) for Dolphin Energy Limited
    Dolphin Energy Limited
    Qatar
    2015
  • Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
    PETRONAS FLNG 1 (L) Ltd
    Malaysia
    2015
  • Reliability Centered Maintenance (RCM) at Chemanol
    Chemanol
    Saudia Arabia
    2015
  • Provision of Risk Based Inspection (RBI) Study for Structure and Pipelines for Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    CPOC
    Malaysia
    2015
  • Provision of Risk Based Inspection (RBI) Study for Structure and Pipelines for Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    Malaysia
    2015
  • Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
    PETRONAS FLNG 1 (L) Ltd
    Malaysia
    2015
  • RBI Assessment Service Providers @ HGP for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2015
  • Risk Based Inspection Study (RBI) for Dolphin Energy Limited
    Dolphin Energy Limited,
    Qatar
    2015
  • Risk Based Inspection (RBI) Assessment on K44 & K83-100 for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2015