Our Experience

  • CONDUCT RISK BASED INSPECTION (RBI) AT JNGLF
    Saudi Aramco
    Saudi Arabia
  • Service provider will perform a risk based inspection (RBI) assessment on Eastern Region Distribution Department (ERDD) facility at Dhahran X-14 Tank Farm that complies with the latest edition of API 580 and API 581.
    Saudi Aramco
    Saudi Arabia
    December 2011
  • Risk Based Inspection (RBI) Study as part of RAS TANURA – Clean Fuels Project for Saudi Aramco
    TECNICAS REUNIDAS, S.A.
    Spain
  • RBI Static Equipment & Piping @ QSWP
    Saudi Aramco
    Saudi Arabia
  • Risk Based Inspection for KhPD Static Equipment
    Saudi Aramco
    Saudi Arabia
  • Provision of Risk Based Inspection (RBI) Assessment for Phase 4 Top Side Vessels, Pipings, Structures and Underwater Pipelines for Block B-17-01
    "Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)"
    Malaysia
    June 2021
  • RBI at ShGPD (R42) FGC, F&SG and PS Area
    Saudi Aramco
    Saudi Arabia
  • Risk Based Inspection Study (RBI) For ARBI 20/23 Gas Wellhead Project
    SAIPEM
    UAE
  • Risk Based Inspection Study as part of AIMS Services as part of EPC for OGD-II and OGD-0 in Asab Area
    Al ASAB/ADNOC Onshore
    Abu Dhabi, UAE
    February 2021
  • Risk Based Inspection (RBI) Program Implementation
    BRUNEI METHANOL COMPANY SENDIRIAN BERHAD
    Sungai
    In Progress
  • Risk Based Inspection Assessment Integrity Services for LAM – 10, LAM – 75, ZHD – 21 & ZHD – 60 Offshore Platforms of DOTL
    Dragon Oil Turkmenistan Limited (DOTL)
    United Arab Emirates UAE
  • Development, Implementation and Support of Risk Based Inspection Programs for Field Production Facilities of the Qurana -2 Field
    Lukoil
    UAE
  • The Service provider shall perform a risk based inspection (RBI) assessment on the All the listed plants at the Yanbu Refinery (YRD) that complies with the current editions of API 580 and API 581
    Saudi Aramco
    Saudi Arabia
    May 2012
  • Criticality Analysis, FMEA, RCM and RBI
    JGC/SONATRACH
    Japan
    March 2019
  • Risk Based Inspection (RBI) Provider for NGPD Gas Oil Separation Plants (GOSPs)
    Saudi Aramco
    Saudi Arabia
  • Conduct Risk Based Inspection at BGP in Plant F-474HP, F-20 and 470
    Saudi Aramco
    Saudi Arabia
  • Risk Based Inspection Assessment Integrity Services For LAM – 13, LAM – 63 & Block – 4 Offshore Platforms Of DOTL
    Dragon Oil Turkmenistan Limited (DOTL)
    Turkmenistan
    December 2019
  • Base Line Risk Based Inspection (RBI) Study for wellhead Structure
    Salamander Energy
    Thailand
  • Supply Specification for Risk Based Inspection (RBI) Study Karan 52/60, Karan 7, Karan TP-1 Auxiliary Platforms
    SAIPEM
    UAE
  • Risk Based Inspection Study as a part of AIMS for EPC for Rumaitha Thamama Zone B Phase – III Expansion & Phase-I VRC Replacement Project
    Al ASAB/ADNOC Onshore
    Abu Dhabi, UAE
    February 2022
  • Provision of Risk Based Inspection (RBI) Study for Structure and Pipelines
    Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    Malaysia
    January 2015