Our Experience

  • Construction Environmental Management Plan (CEMP) Review & Update of CEMP Report Rev 7
    Hyundai Samsung Joint Venture (HSJV)
    UAE
    2023
  • OHRA Exposure Monitoring CTR-2
    ADNOC DRILLING
    UAE
    2023
  • Environmental Monitoring & Testing
    NURAI ISLAND HOTEL
    UAE
    2023
  • Provision of Noise and Hazardous Area Classification Study for the 65MWp Solar PV Power plant-Shuaibah 3 IWP.
    KFB Group/LBPKSA
    KSA
    2023
  • Call Off No. 2 HSE Consultancy Services Contract for GS&S assets Biodiversity Management Plan
    ADNOC HQ
    UAE
    2023
  • Empanelment of Agencies for Hiring Of Chairman for Various HSE Studies / Workshops for EIL, Abu Dhabi Office.
    Engineers India Ltd
    UAE
    2023
  • Update of the ISG Internal Intervention Plan (IIP)
    SONATRACH-S.P.A BP Exploration (El Djazair) Limited EQUINOR In Salah AS
    ALGERIA
    2023
  • Light Intensity Monitoring &Testing for AUH Mussafah Branch
    Arabian Industrial Gases Co. LLC (AIGCO)-A GULF CRYO COMPANY
    UAE
    2023
  • Environmental Studies for North al bahia Residential-Villas Design
    DAR
    UAE
    2023
  • Assessment for the Installation of PV Solar System at TRISTAR Warehouse Roof
    Total Energies Dubai Branch
    UAE
    2023
  • Environmental Monitoring & Testing
    ALPHAMED LLC AL KHAYYAT INVESTMENTS (AKI)
    UAE
    2023
  • HSE Study for DS05 New Trains
    Woodplc
    UAE
    2023
  • Third Party HSE Study / Workshops for FEED for SARB Produced Water Treatment Project of ADNOC Offshore at Zirku Island.
    Engineers India Limited
    UAE
    2023
  • HSE Studies for CNG Virtual Pipeline-GIB @ National Diary LLC
    Cloud Energy Gas
    UAE
    2023
  • Development of a Unit Intervention Plan (Socio-Economic Establishment)
    GTFT
    ALGERIA
    2023
  • Environmental Monitoring & Testing-Bldg C 2023
    Emerson FZE-Bldg C
    UAE
    2023
  • Environmental Monitoring & Testing-2023
    ProGrynd International LLC
    UAE
    2023
  • Risk Assessment Workshop on the MOT Project
    ADYARD
    UAE
    2023
  • Construction Environmental Management Plan (CEMP) with CEMP Audit for Madinat Zayed Project (C04B)
    Combined Group Contracting Co. (CGCC)
    UAE
    2023
  • HSE Studies for EPC for RSF (RIM Seal Fire) and FSF (Full Surface Fire) Fighting System Upgrade for COS Tanks at Zirku)
    Adyard Abu Dhabi LLC
    UAE
    2023
  • SAFETY STUDIES OF FRAME CONTRACT FOR DESIGN PROJECTS (2023~2024)
    China Petroleum Engineering Co. Ltd.
    UAE
    2023