Our Experience

  • Environmental Consultancy Services for Design and Construction Supervision for the Road Parallel to Sheikh Zayed Bin Sultan Street –Al Ain –
    Dar Al-Handasah Consultants (Shair and Partners) B.S.C Closed – Abu Dhabi
    UAE
    2025
  • Environmental Permit Application for N-19427: 400KV OHL Reinforcement works to SWAP the OHL Circuits between S3PS – BNPA1 and BABG – BNP2 Grid Stations and Associated Substation Modification Works
    Instalaciones Inabensa SA
    UAE
    2025
  • Preliminary Environmental Review (PER) Studies for Development of TSE Network in the Emirate of Ajman
    IDROESSE
    UAE
    2024
  • Preliminary Environmental Review (PER) for Stormwater Networks for Non-Served Areas in The Mainland
    IDROESSE
    UAE
    2023
  • Air Dispersion Modelling Study for Three Stacks in Wathba Sewage Treatment Plant with 1 year MET Data
    AmerAir International
    UAE
    2023
  • Environmental Studies (PER) for Ghantoot Naval Base Runway Extension
    National Marine Dredging Company (NMDC
    UAE
    2022
  • Environmental Studies (PER) for Ghantoot Naval Base Runway Extension (Variation No.1)
    National Marine Dredging Company (NMDC
    UAE
    2022
  • OPERATIONS ENVIRONMENTAL MANAGEMENT PLAN (OEMP) for the SUPPLY & RECYCLING of OIL DERIVATIVES
    GREEN FLAME
    UAE
    2021
  • Construction Environmental Management Plan (CEMP) for Well Drilling & Testing Operation in Onshore Block-1
    URJA BHARAT
    UAE
    2020
  • Environmental Monitoring & Testing-Bldg A MAIN Office (FY2026)
    EMERSON
    UAE
    2025
  • Environmental Consultancy for DS415 – Upgrading Stormwater System East of Dubai Canal (DB02, DB03 And DB13 Catchments)
    CONCORD STARS CONTRACTING LLC
    UAE
    2025
  • Construction Environmental Management Plan (CEMP) and CEMP Quarterly Audit for Construction of Sewerage Network Replacement & Rehabilitation in Al Ain – Package 2a (Job in Hand)
    TAMAS PROJECTS
    UAE
    2025
  • Consultancy Services for Construction Environmental Management Plan (CEMP) and Quarterly CEMP Audits For North Al Bahia Residential (Design & Build), Abu Dhabi.
    INNOVO ROADS , INFRASTRUCTURE AND MARINE WORKS LLC
    UAE
    2025
  • Environmental Monitoring & Testing 2025 (Madinat Zayed-Al Dhafra Region)
    ALPHAMED LLC AL KHAYYAT INVESTMENTS (AKI)
    UAE
    2025
  • Indoor Air Quality Monitoring at Transworld External Warehouse
    EMERSON FZE
    UAE
    2025
  • N-19876, Consultancy Services for 132/11kV KEZAD B1-P1 (KB1A) Substation along with related 132kV Cable Works
    GREEN ENERGY CONSULTANCY
    UAE
    2025
  • Environmental Consultancy Services for 400kV OHL, 132kV OHL & Cable Works Related to ADCG Grid Station
    ELSEWEDY POWER ELECTRICAL CONTRACTING
    UAE
    2025
  • Environmental Monitoring & Testing for AUH GCEM-2025
    AUH GCEM (Gulf Cryo Company)
    UAE
    2025
  • Environmental Monitoring & Testing Variation No. 1
    AL KHAYYAT INVESTMENTS (AKI)
    UAE
    2025
  • Environmental Diagnosis and Preparation of Regulatory Studies for Hassi Messaoud (HMD) Fields in Two Lots Lot 1: Environmental diagnostics and regulatory studies for the southern fields – HMD
    SONATRACH, Activité Exploration-Production, Direction Régionale Hassi-Messaoud
    ALGERIA
    2025
  • Environmental Monitoring & Testing-Mold and Mildew
    Dusit Thani Abu Dhabi
    UAE
    2025