Our Experience

  • Indoor Air Quality Monitoring at Transworld External Warehouse
    EMERSON FZE
    UAE
    2025
  • N-19876, Consultancy Services for 132/11kV KEZAD B1-P1 (KB1A) Substation along with related 132kV Cable Works
    GREEN ENERGY CONSULTANCY
    UAE
    2025
  • Environmental Consultancy Services for 400kV OHL, 132kV OHL & Cable Works Related to ADCG Grid Station
    ELSEWEDY POWER ELECTRICAL CONTRACTING
    UAE
    2025
  • Environmental Monitoring & Testing for AUH GCEM-2025
    AUH GCEM (Gulf Cryo Company)
    UAE
    2025
  • Environmental Monitoring & Testing Variation No. 1
    AL KHAYYAT INVESTMENTS (AKI)
    UAE
    2025
  • Environmental Diagnosis and Preparation of Regulatory Studies for Hassi Messaoud (HMD) Fields in Two Lots Lot 1: Environmental diagnostics and regulatory studies for the southern fields – HMD
    SONATRACH, Activité Exploration-Production, Direction Régionale Hassi-Messaoud
    ALGERIA
    2025
  • Environmental Monitoring & Testing-Mold and Mildew
    Dusit Thani Abu Dhabi
    UAE
    2025
  • REQUEST FOR TECHNICAL-COMMERCIAL OFFER PREPARATION OF ENVIRONMENTAL STUDIES
    ALICEF
    ALGERIA
    2025
  • Environmental Consultancy Services for Khatm Al Shaklah Road – Al Ain – Lead Design Consultancy
    DAR
    UAE
    2025
  • Environmental Monitoring & Testing-Bldg A MAIN Office (FY2026)
    EMERSON
    UAE
    2025
  • Environmental Consultancy for DS415 – Upgrading Stormwater System East of Dubai Canal (DB02, DB03 And DB13 Catchments)
    CONCORD STARS CONTRACTING LLC
    UAE
    2025
  • Environmental Consultancy Services for Design and Construction Supervision for the Road Parallel to Sheikh Zayed Bin Sultan Street –Al Ain –
    Dar Al-Handasah Consultants (Shair and Partners) B.S.C Closed – Abu Dhabi
    UAE
    2025
  • Construction Environmental Management Plan (CEMP) and CEMP Quarterly Audit for Construction of Sewerage Network Replacement & Rehabilitation in Al Ain – Package 2a (Job in Hand)
    TAMAS PROJECTS
    UAE
    2025
  • Consultancy Services for Construction Environmental Management Plan (CEMP) and Quarterly CEMP Audits For North Al Bahia Residential (Design & Build), Abu Dhabi.
    INNOVO ROADS , INFRASTRUCTURE AND MARINE WORKS LLC
    UAE
    2025
  • Environmental Permit Application for N-19427: 400KV OHL Reinforcement works to SWAP the OHL Circuits between S3PS – BNPA1 and BABG – BNP2 Grid Stations and Associated Substation Modification Works
    Instalaciones Inabensa SA
    UAE
    2025
  • Environmental Monitoring & Testing 2025 (Madinat Zayed-Al Dhafra Region)
    ALPHAMED LLC AL KHAYYAT INVESTMENTS (AKI)
    UAE
    2025
  • Environmental Monitoring & Testing_2023
    CAPE EAST LIMITED, ABU DHABI (ALTRAD)
    UAE
    2024
  • Ref# 10003516-Environmental Monitoring & Testing for Plot # 105HR9A-2024
    AGSI
    UAE
    2024
  • Preliminary Environmental Review (PER) Studies for Development of TSE Network in the Emirate of Ajman
    IDROESSE
    UAE
    2024
  • Environmental Monitoring & Testing_2024
    ADYARD ABU DHABI LLC ALTRAD
    UAE
    2024
  • Terrestrial Survey for Bab & Bu Hasa Sites of ADNOC
    ASPPEC Environmental Consultants LLC
    UAE
    2024