Risk Based Inspection (RBI) and Remaining Life Assessment (RLA) of GTFT Static Equipment

  • Groupement TFT (GTFT)
  • Algeria
  • North Africa
RBI & RLA
Velosi was assigned by Groupement TFT (GTFT) to perform the RBI study and RLA for static equipment.

Scope

Under the scope of work, this report contains the Risk Assessment of GTFT static equipment and presents the objective of the study, the methodology applied and the analysis results as well as appropriate recommendations arising out of the study.

Process

Strict methodology was implemented following a critical analysis report to provide actionable recommendations.

Outcome

Velosi’s team of expert individuals successfully performed activities under the scope of work assigned.

The team carried out risk assessment by adopting a semi-quantitative approach in accordance with API-580/581.

Deliverables

Team Velosi developed the following deliverables:

  • Development of corrosion loops and identification of damage mechanisms
  • Predict the Probability of Failure of each degradation mechanism
  • Predict the Consequence of Failure for each item.
  • Corrosion Rates and Remaining Life Results
  • Inspection History Review & Findings
  • Risk ranking
  • Development of Inspection Plan
how can we help you?

Contact us at the Velosi office nearest to you or submit a business inquiry online.

The strength of our approach comes from offering a multiregional service while meeting local needs. Velosi achieves this because we operate in selected world’s major established and emerging markets.

Mr. Ijaz Ul Karim Rao
Ijaz Ul Karim Rao
MD, Velosi Asset Integrity Limited

Let us help you to provide the best solution for your asset !