Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD

  • PETRONAS
  • Malaysia
  • Southeast Asia
PETRONASRBI
Velosi performed a Risk Based Inspection and Integrity Studies for 213 pipelines belonging to the inventory of Petronas Carigali Sdn. Bhd located in Malaysia resulting in substantial cost savings.

Objective

  • Velosi perform unparalleled Risk-Based Inspection Assessment and Integrity Studies to assure total quality of existing pipeline.

Scope of Work

  • Perform screening and initial risk assessment
  • Perform the detailed Risk-Based Inspection Assessment on the pipelines identified in screening and initial assessment
  • Determining the integrity of the assets
  • Updating the Corrosion Management Plan based on the results of the RBI Assessment
  • Providing detailed RBI reports for the pipelines on which RBI was performed detailing the various damage mechanisms acting on the pipeline and provide the remaining life for them.

Deliverables

  • Screening and initial assessment
  • Detailed Assessment Report inclusive of
    • Section Division Drawing
    • Detailed Assessment Calculation
    • Integrity Management Plan
  • Integrity Management Plan
How can we help you?

Contact us at the Velosi office nearest to you or submit a business inquiry online.

Excellent training program from Veloci for PHA facilitators. This extensive training program provided a great opportunity to learn the HAZOP leadership techniques inline with IEC-61882 and world best practices from highly qualified, knowledgeable and experienced training provider.
Veloci coordination throughout the training program was outstanding.

Nadeem Ahmad
Director and Principal Consultant Process Safety and Risk Management, Risk Management and Safety Solutions (RMSS)

Let us help you to provide the best solution for your asset !