HSEIA Services For Sunrise – 48” GCS – Margham Pipeline

  • Kent
  • United Arab Emirates
  • Middle East
HSEIA Services
Velosi was assigned to provide consultancy services for the Health, Safety & Environmental Impact Assessment (HSEIA), for Sunrise - 48” GCS - Margham Pipeline. This involved various activities such as PHA, HAZOP, EIA studies and, identification of HSECES along with their critical activities through Bow-Tie Workshop, and preparation of Performance Standards.

Scope

The overall objective of the Margham to GCS Pipeline Project was to install the new pipeline on schedule, within budget, and in accordance with appropriate codes and specifications. It also ensured the following:  

  • Enabling the export/import of gas to/from GCS in a safe, efficient, and continuous manner.  
  • Exploring all appropriate design options and determining those solutions that provide the best value to the client.  
  • Obtaining all relevant NOCs required as per the relevant legislative requirements.  
  • Completion of all major design engineering works and procurement activities in accordance with the overall schedule  
  • Completion of all installation and commissioning activities to allow the new pipeline to be operational from Q2 2027.  

Process

A comprehensive approach was implemented to ensure that the risk assessments, hazard identification, critical components, safety management, and environmental impact evaluations, were thoroughly addressed throughout the project scope. 

Outcome

Velosi successfully provided consultancy services for the Health, Safety & Environmental Impact Assessment (HSEIA) for the Sunrise – 48” GCS – Margham Pipeline FEED and DED phase. The scope included a variety of critical studies, which helped identify key risks and provided comprehensive risk assessments to ensure the safety of the project.  

The Environmental Impact Assessment (EIA) addressed key potential impacts, including air quality, marine water, waste management, noise, and socio-economics, with mitigation measures in place to manage and reduce risks. The project’s environmental impact is expected to be minimal, supported by best practices.  

A review of ADNOC’s HSEMS confirmed that it adequately addresses medium and low hazards identified in the HAZID, ENVID, and OHID workshops, provided it is properly implemented and monitored. This comprehensive approach ensures compliance with ADNOC’s safety and environmental standards for the project. 

The project also resulted in the identification of several recommendations to enhance the safety systems. All findings and proposed measures were thoroughly documented, providing a comprehensive framework to strengthen safety and operational efficiency throughout the project lifecycle. 

Deliverables

Velosi successfully submitted the following deliverables: 

  1. HAZID (TOR & Workshop Report) 
  2. ENVID (TOR & Workshop Report) 
  3. OHID (TOR & Workshop Report) 
  4. Pipeline HAZOP (TOR & Workshop Report) 
  5. Bow-Tie (TOR & Workshop Report) 
  6. Environmental Aspect Register 
  7. Environmental Impact Assessment 
  8. SCE Performance Standard (Project Phase) 
How can we help you?

Contact us at the Velosi office nearest to you or submit a business inquiry online.

The strength of our approach comes from offering a multiregional service while meeting local needs. Velosi achieves this because we operate in selected world’s major established and emerging markets.

Mr. Ijaz Ul Karim Rao
Ijaz Ul Karim Rao
MD, Velosi Asset Integrity Limited

Let us help you to provide the best solution for your asset !