EPC Phase HSEIA Study for Gas Distribution Network of Abu Dhabi Gas Distribution Company

  • ADNOC City Gas
  • United Arab Emirates
  • Middle East
HSEIA Study
Velosi was appointed as the HSEIA Consultant to provide consultancy services for EPC Phase HSEIA studies for Gas Distribution Network of Abu Dhabi Gas Distribution Company. This involved several key activities, including:
• PHA, HAZOP and EIA studies
• Identification of HSECES through Bow-Tie Workshop along with their critical activities.
• Preparation of Performance Standards
• Conducting Quantitative Risk Assessments
• Carrying out ISD and SIMOPS Studies
• Reviewing ERP in relation to the identified MAHs

Scope

The main objective of this project was to conduct HSEIA studies for the Natural Gas Distribution Network being implemented by ADNOC City Gas in the Emirate of Abu Dhabi during the EPC Stage. This project encompasses the New Areas Scope of Works (VO-2) with reference to the construction of 4 bar natural gas distribution pipeline network in Abu Dhabi, which include:

  1. Abu Dhabi Mall Area
  2. Al Mariyah Island
  3. Khalifa City Area (Al Forsan Mall)
  4. Fisherman’s Wharf
  5. Musaffah Commercial (Delma Mall) & Al Shabiya Area

Process

A Comprehensive approach is set forth to ensure all HSE hazards and impacts have been identified, risk assessed and control measures implemented, to ensure that the risk is managed at ALARP.

Outcome

Velosi successfully conducted the HSEIA studies for the Gas Distribution Network of Abu Dhabi Gas Distribution Company during the EPC phase.

The EIA findings identified typical construction impacts such as dust, emissions, noise, and waste, which can be managed through best practices and a Construction Environmental Management Plan (CEMP). Operational impacts, including vehicular emissions and waste generation, were also considered low and manageable with a waste management plan. The mitigation measures outlined in the EIA will further minimize risks.

The COMAH assessment confirmed that all hazards were identified and assessed against ADNOC’s Risk Tolerability Criteria. MAHs were analyzed via Bow-Tie and Process Safety expertise, with QRA studies confirming risks remain within acceptable limits. A SIMOPS matrix was developed to ensure safe construction operations with appropriate controls.

The project also led to the formulation of numerous recommendations that addressed identified shortcomings and proposed enhancements to improve risk management and operational safety. Overall, the HSEIA studies provide a comprehensive framework for managing environmental and safety risks, ensuring the project meets ADNOC’s safety and environmental standards while supporting efficient and sustainable operation.

Deliverables

Velosi successfully submitted the following deliverables:

  1. HAZID Workshop Report
  2. ENVID Workshop Report
  3. OHID Workshop Report
  4. HAZOP Workshop Report
  5. EIA Scoping Report
  6. Environmental Impact Assessment Report
  7. Construction Environmental Management Plan (CEMP) Report
  8. Waste Management Plan Report
  9. Bow-Tie Review Report
  10. HSECES Performance Standard Report
  11. ISD Workshop Report
  12. Quantitative Risk Assessment (QRA) Report
  13. SIMOPS Workshop Report
  14. ERP Review Report
  15. HSEIA Screening Report
  16. HSE Action Tracking Register
  17. SRM Deliverables
How can we help you?

Contact us at the Velosi office nearest to you or submit a business inquiry online.

The strength of our approach comes from offering a multiregional service while meeting local needs. Velosi achieves this because we operate in selected world’s major established and emerging markets.

Mr. Ijaz Ul Karim Rao
Ijaz Ul Karim Rao
MD, Velosi Asset Integrity Limited

Let us help you to provide the best solution for your asset !