Corrosion Risk Assessment Study for Borouge-2 Plant
Scope
The total assets covered in client facility for the RBI study are 1963 equipment.
The scope of work included marking of corrosion loops over PFDs and P&IDs, Identification of damage mechanism as per API-571, and corrosion risk assessment.
Process
Velosi Performed Corrosion Risk Assessment Study (CRAS) for equipment within client Facility as per API-580/581, utilizing VAIL-Plant software PEMS module.
Outcome
Velosi successfully carried out the Corrosion Risk Assessment Study (CRAS) for equipment within client facility of Borouge by adopting semi quantitative approach and utilizing VAIL Plant Software (PEMS module). The methodology used for this project is based on API RP 581.
Deliverables
Velosi submitted the following deliverables:
- CRAS Methodology
- Corrosion Loop Drawings
- CRAS Report
VAIL Plant Software Modules:
PEMS – Pressurized Equipment Management System