Third Party Asset Integrity Review of Al Karkara Facilities
Date
October 28, 2022
Our Role
Awarded
Qatar Petroleum Development (QPD) Co. Ltd. has awarded a contract to Velosi to conduct 3rd Party Asset integrity Review of Al Karkara facilities at QPD offshore in Qatar.
The Velosi team will perform the below-mentioned activities and submit the following deliverables.
Activities:
- Perform detailed review of QPD documentation such as operating manuals, standards etc.
- Define the methodology for the Integrity Assessment of the plant
- Perform Site visit to verify the information as well as conduct site interviews with operational staff
- Perform a detailed Assessment of the integrity status
- Preparation of Audit protocol of each specific system.
𝐃𝐞𝐥𝐢𝐯𝐞𝐫𝐚𝐛𝐥𝐞𝐬:
- Submission of Audit protocol of each specific system.
- Prepare Current Status Report for Each Equipment / System
- Prepare a corrective action Report with the following
– Immediate actions deemed necessary to ensure the integrity of the Asset
– Medium Term actions required to ensure the integrity of the Asset for the next 5 years from the assessment year
– Long-time actions required to ensure the integrity of the Asset for a period over 20 years from the 5th year.
– Prepare a high-level cost estimate for the proposed recommendations with an execution plan. - Prepare the Corrective action Register in Excel to follow up on the actions.
- Prepare a management presentation and present to all stakeholders including QP