Reliability, Availability, and Maintainability (RAM) Study for SAHIL & HALIBA new developments.
Bilfinger Tebodin Middle East awarded Velosi to conduct a Reliability, Availability, and Maintainability (RAM) Study for SAHIL & HALIBA new developments.
The project will perform by adopting the RAM approach. Furthermore, the RAM study included all types of equipment that directly or indirectly affected the overall performance.
Velosi’s expert technical team will efficiently carry out the RAM study and establish the availability by reviewing and compiling the input data, extracting input clarifications with Bilfinger Tebodin Middle East & AGP interface, and preparing a final report with productive conclusions.
Velosi substantially creates a RAM Model for the assessment of principal reliability figures and breakdown of availability losses for the overall system. The model implement accounts for scheduled shutdowns along with the unscheduled failures of the components. MAROS software will be productively utilized for RAM Analysis.
Team Velosi will conclude the project by executing the following deliverables:
• Methodology of RAM study
• RAM Study Basis/ Assumption Register
• RBD (Reliability Block Diagram) of the System
• RAM Model
• Results of the Simulation
• Sensitivity Analysis
• Final Report with all the findings and conclusions