RBI Implementation for LAM-10, LAM-75, ZHD-21 & ZHD-60 Offshore Platforms.

Date
October 28, 2022
Our Role
Awarded

Velosi has been appointed by Dragon Oil (DOTL) to perform RBI Study for topside equipment and piping, pipelines & structures for offshore platforms LAM-10, LAM-75, ZHD-21 & ZHD-60 in the Caspian Sea (TR 1907) by utilizing VAIL-Plant software in DOTL Plants in Turkmenistan.

Velosi team will carry out the Risk-Based Inspection (RBI) study within LAM-10, LAM-75, ZHD-21 & ZHD-60 platforms of DOTL by adopting a semi-quantitative RBI approach and utilizing VAIL Plant Software (PEMS, PIMS & SIMS module). The RBI methodology for this project will be based on API RP 581.

𝐓𝐞𝐚𝐦 𝐕𝐞𝐥𝐨𝐬𝐢 𝐰𝐢𝐥𝐥 𝐜𝐨𝐦𝐩𝐥𝐞𝐭𝐞 𝐭𝐡𝐞 𝐩𝐫𝐨𝐣𝐞𝐜𝐭 𝐛𝐲 𝐞𝐱𝐞𝐜𝐮𝐭𝐢𝐧𝐠 𝐭𝐡𝐞 𝐟𝐨𝐥𝐥𝐨𝐰𝐢𝐧𝐠 𝐝𝐞𝐥𝐢𝐯𝐞𝐫𝐚𝐛𝐥𝐞𝐬:

  • Corrosion Loop Drawings (PFDs and P&IDs) – Equipment & Piping
  • Section Division Drawings – Pipeline
  • Tag Marked Drawings – Structure
  • Asset Registers
  • Corrosion Rates and Remnant Life
  • Corrosion Inspection Strategy Manual
  • Risk Ranking Assessment
  • List of Critical Assets
  • PIR Criteria
  • Inspection Plan
  • Inspection Drawings
  • IOW’s
  • Asset Passports
  • RBI Study Report

𝐕𝐀𝐈𝐋-𝐏𝐥𝐚𝐧𝐭 𝐒𝐨𝐟𝐭𝐰𝐚𝐫𝐞 𝐌𝐨𝐝𝐮𝐥𝐞𝐬:

  • PEMS – Pressurized Equipment Management System
  • PIMS – Pipeline Integrity Management System
  • SIMS – Structure Integrity Management System
RBI Implementation

Let us help you to provide the best solution for your asset !