A Major Marine Dredging Company in the Middle East has awarded a contract to conduct Risk Based Inspection for ESTIDAMA Sales Gas Pipeline Network Enhancement

A Major Marine Dredging Company in the Middle East has awarded a contract to Velosi to conduct Risk Based Inspection for ESTIDAMA Sales Gas Pipeline Network Enhancement in United Arab Emirates

Client
A Major Marine Dredging Company in the Middle East
Date
06 June 2024
Our Role
Awarded

A Major Marine Dredging Company in the Middle East has awarded a contract to Velosi to conduct Risk Based Inspection for ESTIDAMA Sales Gas Pipeline Network Enhancement in United Arab Emirates.

According to the project, Velosi Technical team will perform the inspection of Static Equipment & Piping System, Pressure Safety Valves and Pipelines for ESTIDAMA Sales Gas Pipeline Network Enhancement Package 3.

API RBI quantitative assessment study will conduct for piping and equipment in accordance with the latest revision of the API RP581 standard using GE APM 4.6 software whereas VAIL-Plant® (Velosi’s proprietary software) will utilize for RBI assessment of pipelines.

𝐓𝐡𝐞 𝐦𝐚𝐢𝐧 𝐬𝐜𝐨𝐩𝐞 𝐨𝐟 𝐭𝐡𝐞 𝐑𝐁𝐈 𝐒𝐭𝐮𝐝𝐲 𝐰𝐢𝐥𝐥 𝐛𝐞 𝐚𝐩𝐩𝐥𝐢𝐜𝐚𝐛𝐥𝐞 𝐭𝐨:
• All Pressure Piping (Process and Utility)
• Static Pressure Containment Equipment
• Pressure Relief Devices / Valves (PRD /PRV)
• Pipelines
• And any static items listed under API 580 and API 581

𝐓𝐞𝐚𝐦 𝐕𝐞𝐥𝐨𝐬𝐢 𝐰𝐢𝐥𝐥 𝐜𝐨𝐦𝐩𝐥𝐞𝐭𝐞 𝐭𝐡𝐞 𝐩𝐫𝐨𝐣𝐞𝐜𝐭 𝐛𝐲 𝐢𝐬𝐬𝐮𝐢𝐧𝐠 𝐭𝐡𝐞 𝐟𝐨𝐥𝐥𝐨𝐰𝐢𝐧𝐠 𝐝𝐞𝐥𝐢𝐯𝐞𝐫𝐚𝐛𝐥𝐞𝐬:
• RBI Methodology
• Comprehensive RBI assessment reports covering risk analysis and risk ranking
• Corrosion loops marked-up and inventory drawings
• Develop Integrity Operating Windows (IOWs)
• RBI Asset Register
• Mechanical Assessment sheet
• Pipeline Section Layout Drawings
• Test frequencies for relief valves and PSVs will be define through RBI
• Final RBI Manual

Enquire Now

Let us help you to provide the best solution for your asset !