Risk Based Inspection (RBI)
Risk-based Inspection sets forth a comprehensive approach towards the maintenance of business processes used to analyze various equipment. It is a decision-making technique to optimize inspection plans. Led by industry experts, we employ a comprehensive and structured approach – in line with industry guidelines following API 580, 581 and API 571 – to analyze the potential risks of each asset by evaluating their current operating conditions in terms of the probability and the consequence of failure, providing our clients with a unique view of the condition of each asset.
Strategic Inspections, Operational Excellence, Maximizing Efficiency
Elevate your asset management with Velosi’s Risk-Based Inspection (RBI) service, which is set to precisely formulate accuracy and efficiency. Our proactive approach empowers organizations to strategically prioritize inspections, focusing on potential failure risks. This risk-centric approach allows for the creation of inspection plans that optimize resource allocation.
Read More


Benefits of RBI
Identify the high-risk values
Understand the risk drivers and develop mitigation plans.
Generate focused inspection plans which enhance safety and reduces risk.
Assist to improve asset reliability.
Increase confidence in equipment integrity and reliability
Maximizes resource utilization.
Enhance operating efficiency.
Develop a cost-efficient approach.
RBI Deliverables
Corrosion Loop Drawings
Inspection Isometric Drawings for Equipment and Piping
Inventory Group Drawings
Inspection Isometric Drawings for Equipment and piping
Technical Risk Based Inspection (RBI) Report
Corrosion and Inspection Strategy Document
Integrity Operating Window
Asset Passports
RBI Case Studies
RBI Insights
Our Experiences
-
Provision of RBI Assessment for Static Mechanical Equipment
Newfield
Malaysia
2012
-
Risk Based Inspection (RBI) based Small Bore Piping Integrity Program for Egyptian LNG.
Egyptian LNG.
Egypt
2011
-
Risk Based Inspection (RBI) based Strategy for the management of Dead Leg of Unit 1U-14, 15, 16 and 17 for Egyptian LNG.
Egyptian LNG.
Egypt
2012
-
Baseline Risk Based Inspection (RBI) Study for Topsides Equipments
Salamander Energy
Thailand
2012

