Our Experience

  • Third Party Design Appraisal / Verification for the Calculation Report
    Prominent Team Consultancy LLC
    UAE
    2021
  • Call Out No. 7 CALL-OFF ORDER FOR CONSULTANCY STUDIES & TECHNICAL SUPPORT SERVICES UNDER CONSULTANCY AND PROFESSIONAL SERVICES AGREEMENT FOR ASSET INTEGRITY CONSULTANCY STUDIES & TECHNICAL SUPPORT SERVICES ON CALL-OUT BASIS
    ADNOC
    UAE
    2021
  • Update of Project Management Manual With Value Assurance Process
    ADNOC Drilling Company P.J.S.C.
    UAE
    2021
  • Work Order No. 2 Consultancy Services for the Preparation of RFP for the Defect Repairs, Upgrade and Operational Maintenance of the Underground Container System Project within Abu Dhabi Main Island and Al Ain, in the Emirate of Abu Dhabi
    Abu Dhabi Waste Management Center – Tadweer
    UAE
    2021
  • Products Testing as per SASO
    Testori Emirates Filtration Factory LLC
    UAE
    2021
  • Application of Digital Oil Field (DOF) Technology on Brownfield Towers in ZK (For 2nd Workshop on 18-March-2021)
    Control & Applications Emirates
    UAE
    2021
  • Fitness For Service and Risk Assessment of BUNDUQ Subsea Pipelines
    BUNDUQ COMPANY LIMITED
    UAE
    2021
  • Application of Digital Oil Field (DOF) Technology on Brownfield Towers in ZK (For 4th Workshop)
    Control & Applications Emirates
    UAE
    2021
  • Provision of Design Calculation for fit for service purpose
    Velosi Certification
    Qatar
    2021
  • Provision of Third Party Design Verification of Radiant Bundle Supports – H.330189.959 – ADOC Tube Coils
    Bilfinger Deutsche Babcock Emirates LLC
    UAE
    2020
  • Inspection Service – Fitness for Service assessment as per 1051/19-4532/DH-KTTB
    BSR
    Vietnam
    2020
  • Framework Consultancy Services on Call Off-Basis
    Tadweer
    UAE
    2020
  • FFS Study Services for Longevity 2040 Study of LNG Train Static Equipment – 18 no’s
    ADNOC LNG
    UAE
    2020
  • Application of Digital Oil Field (DOF) Technology on Brownfield Towers in ZK
    Control & Applications Emirates
    UAE
    2020
  • FFS Study for Train-3 Thermal Fatigue Piping
    ADNOC LNG
    UAE
    2020
  • Provision of third party design verification to check suitability of end cap material SA-234 instead of existing SA-105.
    Bilfinger Deutsche Babcock Emirates LLC
    UAE
    2020
  • Preparation of ITT EPIC Package for Implementation of Pigging Facilities for Un-piggable Pipelines
    Dragon Oil
    UAE
    2019
  • PM Program for Civil & Structural Elements in Smelter
    MA'ADEN ALUMINUM
    Saudi Arabia
    2019
  • Provision for “Third party consultancy investigative study for the damage to existing boundary walls”
    Al Nasr Contracting Company L.L.C.
    UAE
    2019
  • Provision for Preparation of Design Calculation & Endorsement Scaffolding Structure as per BS EN 12811-1
    Trading and Agency Services Limited Company W.L.L
    Qatar
    2019
  • Design Verification of the Trench Sheeting Shoring System
    Al Nasr Contracting Company L.L.C.
    UAE
    2019