Risk Based Inspection Study
SAIPEM appointed Velosi to conduct a Risk-Based Inspection (RBI) study as part of the overall North Field Production Sustainability (NFPS) Offshore and Pipelines Project.

Scope

The Project Scope of work included Risk Based Inspection Planning encompassing the following activities to be carried out:

  • Corrosion Loop Drawings
  • Corrosion Loop Description
  • Piping Group Drawings
  • Inventory Group Drawings
  • IOWs
  • SAP Upload Templates
  • RBI Meridium Data Upload Template

Process

A comprehensive approach was set to ensure all essential components integral to the project scope were included.

  • Development of Piping Asset Register
  • Utilized Process Flow Diagrams (PFDs) and Heat and Material Balance for:
  1. Developing Corrosion Loops
  2. Assigning Degradation Mechanisms for each loop
  • Employed Piping and Instrumentation Diagrams (PIDs) to demarcate Corrosion Loops from PFDs
  • Created Corrosion Loop Description Document for each loop marked on PFDs
  • Grouped Piping in a piping circuit using Asset Register:
  • Marked boundaries of each piping circuit on PID
  • Developed Piping Circuit Drawings
  • Marked Inventory Groups with clear boundaries on PFDs
  • Identified critical process parameters and Integrity Operating Windows for each Corrosion Loop based on Degradation Mechanisms
  • Developed SAP template for asset creation in SAP
  • Created RBI Templates for Risk Assessment and Inspection Plan generation in GE APM – Meridium.

Outcome

Velosi’s team of expert individuals successfully conducted a Based Inspection Study at SAIPEM NFPS offshore and Pipeline Projects as per COMPANY requirements.

The project was a success that surpassed all company expectations through accurate planning and a reliable commitment to quality. The project team achieved results that not only fulfilled the established objectives but also significantly improved overall performance. The dedication and collaborative efforts exhibited throughout the project were crucial in meeting goals within the designated timeline, thereby establishing a new benchmark for future initiatives.

Deliverables

Team Velosi developed the following deliverables:

  • Corrosion Loop Drawings
  • Corrosion Loop Description
  • Piping Group Drawings
  • Inventory Group Drawings
  • Integrity operating Windows (IOWs)
  • SAP Templates
  • RBI Meridium Data Upload Template
how can we help you?

Contact us at the Velosi office nearest to you or submit a business inquiry online.

The strength of our approach comes from offering a multiregional service while meeting local needs. Velosi achieves this because we operate in selected world’s major established and emerging markets.

Mr. Ijaz Ul Karim Rao
Ijaz Ul Karim Rao
MD, Velosi Asset Integrity Limited

Let us help you to provide the best solution for your asset !