Our Experience

  • Environmental Studies for North al bahia Residential-Villas Design
    DAR
    UAE
    2023
  • Assessment for the Installation of PV Solar System at TRISTAR Warehouse Roof
    Total Energies Dubai Branch
    UAE
    2023
  • Environmental Monitoring & Testing
    ALPHAMED LLC AL KHAYYAT INVESTMENTS (AKI)
    UAE
    2023
  • HSE Study for DS05 New Trains
    Woodplc
    UAE
    2023
  • Environmental Monitoring & Testing-Bldg C 2023
    Emerson FZE-Bldg C
    UAE
    2023
  • Third Party HSE Study / Workshops for FEED for SARB Produced Water Treatment Project of ADNOC Offshore at Zirku Island.
    Engineers India Limited
    UAE
    2023
  • HSE Studies for CNG Virtual Pipeline-GIB @ National Diary LLC
    Cloud Energy Gas
    UAE
    2023
  • Development of a Unit Intervention Plan (Socio-Economic Establishment)
    GTFT
    ALGERIA
    2023
  • Environmental Monitoring & Testing-2023
    ProGrynd International LLC
    UAE
    2023
  • Risk Assessment Workshop on the MOT Project
    ADYARD
    UAE
    2023
  • Construction Environmental Management Plan (CEMP) with CEMP Audit for Madinat Zayed Project (C04B)
    Combined Group Contracting Co. (CGCC)
    UAE
    2023
  • HSE Studies for EPC for RSF (RIM Seal Fire) and FSF (Full Surface Fire) Fighting System Upgrade for COS Tanks at Zirku)
    Adyard Abu Dhabi LLC
    UAE
    2023
  • SAFETY STUDIES OF FRAME CONTRACT FOR DESIGN PROJECTS (2023~2024)
    China Petroleum Engineering Co. Ltd.
    UAE
    2023
  • Environmental Monitoring & Testing-Joinery Division Factory 1
    FIBREX LLC-Contracting Division
    UAE
    2023
  • EIA and EDD Consulting Services for HBNS & El Merk
    Groupement Berkine
    ALGERIA
    2023
  • HSE Studies for Bu Haseer ESP Surface Facilities Package
    ADYARD
    UAE
    2023
  • Environmental Monitoring & Testing
    Ritz Carlton Hotel Abu Dhabi
    UAE
    2023
  • Prestation D’Elaboration des Etudes pour le projet CENTRE DE TRAITEMENT HASSI ILLATOU (CFC)
    SARPI
    ALGERIA
    2023
  • Sampling & Testing of Marine Water (Al Gurm Site)-Extension 5 Months
    ASGC
    UAE
    2023
  • HSE Studies for New Battery Systems For Das Substations and Upgrade of Al Qatia Diesel Generator
    FALCOR
    UAE
    2023
  • Safety Study For Mishrif Qurainat New Facility (MQNT) for the Rumaila Oil Field CTR-5 As a Part of SAFETY STUDIES OF FRAME CONTRACT FOR DESIGN PROJECTS (2023~2024)
    China Petroleum Engineering Co. Ltd.
    UAE
    2023